My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-031
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 10:58:58 AM
Creation date
2/20/2025 10:58:31 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/13/2001
Control Number
2001-031
Subject
Amendment 2 for Professional Service Agreement for
Applied Technology & Management for Design & Permitting
Scope of Servoces and Compensation for IRC Beach Preservation Projects
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
!_ <br />• <br />Scope of Work <br />Page 8 <br />the Public Workshop and Hearing. Noticing procedures required by the FDEP are well <br />understood and will be strictly followed to the extent the County requires assistance in <br />this regard. <br />ATM will work closely with County staff in generating the mailing list of riparian owners <br />located within 1,000 feet of the proposed line, by accessing the County property <br />appraiser's database. Affidavit of publication in the newspaper with largest local <br />distribution (confirming the notice has been placed for three consecutive weeks prior to <br />the announced date of the workshop/hearing, and once in the Florida Administrative <br />Weekly) shall be furnished to the State promptly. FDEP Bureau of Beaches and <br />Coastal Systems staff, as the designated hearing Officer for the ECL Public Hearing, <br />shall be contacted well in advance of publication by ATM to confirm scheduled <br />availability for this important meeting. <br />ATM will prepare exhibits for and participate in presenting the concept and implications <br />of the ECL to the Public Workshop/Hearing attendees, and shall entertain questions <br />prior to formal Hearing proceedings to ensure the process is understood. Audio <br />recording equipment must be provided by the County to provide a permanent voice <br />record of the proceedings. <br />ATM will ensure the ECL approval schedule is expedited by confirming via frequent <br />telephone contact with the Hearing Officer in the thirty -day comment period following <br />the hearing, that processing is proceeding as anticipated. If it is not, ATM will ascertain <br />whether ATM or County assistance is required, and shall report it to County <br />immediately. <br />Timely submittal of Affidavits and notice copies will assist the Hearing Officer in <br />expeditious processing of the ECL and subsequent forwarding to the FDEP Bureau of <br />Surveying and Mapping for final approval. ATM will complete ECL processing by <br />ensuring that the approved line is properly recorded in Indian River County as a <br />permanent record of the established boundary of state-owned lands. <br />Task 1.A.12 Compute Adjacent Project Area and Secondary Nearshore <br />Hardbottom Impact Acreages <br />Utilizing the (*.tiff) images prepared by Coastal Science Associates, Inc. in January <br />2000, and the post -processed aerial images prepared by Morgan & Eklund, Inc. in <br />December 1999, ATM will rectify the *.tiff images (which contain color coding by <br />hardbottom type) and compute the nearshore hardbottom acreages in the adjacent <br />project areas. Generally, this will be accomplished for the shoreline segments 1,000 ft <br />north and 3,000 ft south of the Sectors 1 and 2 proposed fill limits. <br />The computed acreages will be presented in tabular format and presented with the <br />Sector acreages expected to be impacted by sand burial or temporary coverage. The <br />permit drawings will be modified to include these project -adjacent shorelines and <br />transmitted to the Department for inclusion into the digital application drawing set. An <br />N -Line model for each nourishment project may be required by the State, although a <br />cost for this work is not included in this budget. <br />C 1WN00YMTEUM CShore 127Addei WSmv 01-10-006-JIWA1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.