Laserfiche WebLink
TASK 2 — BOARDWALK DESIGN and CONSTRUCTION ADMINISTRATION <br />• Coordinate with CLIENT on boardwalk locations and dimensional criteria. <br />• Prepare site plan depicting boardwalk locations and connections to walking trails. Determine <br />boardwalk widths for pedestrian traffic, ADA compliance, and any vehicle access <br />requirements. <br />• Designate the type, height, and spacing of railings. <br />• Determine finished elevation for top of deck based on base flood elevation criteria. <br />• Coordinate with Geotechnical Engineer for soil boring locations, expected loads, and pile <br />depths. Soil testing is not included with this proposal and will be provided by the CLIENT. <br />• Prepare construction specifications and details for boardwalk deck, supports, and piling <br />materials. <br />• Prepare engineering calculations for structural integrity of the boardwalk and submit to Indian <br />River County (IRC) Building Department. <br />• Provide follow through during permitting process to address IRC review comments. <br />• Provide periodic site inspections to observe pile installation, stringers, bents, and fasteners. <br />TASK 3 — PAVILION ARCHITECTURAL SERVICES <br />A. Design, Documentation, and Bidding Support: <br />• Schedule and conduct a review meeting with Owner for the purpose of presenting the <br />programming for review and approval. <br />• Finalize project requirements, schedule, and process. <br />• Survey of the existing affected areas to establish existing conditions, dimensions, and <br />characteristics for the project. <br />• Develop full design development documents for review. <br />• Florida building code and fire prevention code compliance. <br />• Develop construction documents and specifications. <br />• Conduct our in-house `Fresh -Eye' quality control review of bid package. <br />• Submit to and support the permit review and approval process. <br />• Attend Pre -Bid meeting, respond to request for information (RFI) during bidding and issue <br />addenda as necessary. <br />• Prepare estimates of probable construction cost at 100% design development and 50% <br />construction document milestones. <br />B. Construction Administration and Close Out: <br />• Assist in coordinating an AIA contract between contractor and Owner for approval by <br />Owner's counsel. <br />• Issue Notice of Award on behalf of the Owner. <br />• Represent Owner's interests through construction process, monitoring construction for <br />conformance with designs, specifications, and construction requirements. <br />• Attend a preconstruction meeting. <br />• Attend a maximum of 12 job meetings, once every two weeks during construction. <br />Page 2 of 4 <br />