Laserfiche WebLink
m <br />authorization if needed. These requirements for these improvements will not be known until <br />the sub -consultant studies are performed. <br />4. Landscape, arborist, and irrigation design services am not included with this fee proposal. <br />5. Wetland permitting is not included. Wetland planting design drawings, . plant lists, and <br />installation shall be provided .by others. <br />6. The respective utility provider shall provide conduit design and layout. <br />7. Construction stakeout and as -built surveys are not included with this proposal. It is anticipated <br />that the contractor will be responsible for construction stakeout and as -built surveys. CAT can <br />provide these services for the contractor if he chooses. <br />Thank you for giving us the opportunity to sit a. proposal for our services. We look forward <br />to working with you on this project. Our receipt of a signed copy of this agreement will serve as <br />our notice to proceed; Should you have any questions or need additional information, please do <br />not hesitate to contact me at our office. <br />Sincerely, <br />Agreed to and Accepted.• <br />By: <br />Print Name: <br />Address: <br />Date: <br />Page 4 of 4 <br />