Laserfiche WebLink
INDIAN RrvER BLvD. PEDESTRIAN & BicycLE Across IWRovFIVMNzs Page -2- <br />IRC PROJECT No. IRC -1817 <br />AACE Proposal No. P25-3185 <br />Hourly and Testing Charges: <br />Due to the limited number of density tests that will likely be performed during each visit to the project site by an AACE Engineering Technician, <br />we propose to staff this project on an hourly basis, billing portal-to-portal. Man-hour and testing estimates provided below were provided by <br />the Client. <br />Engineering Technician Billed hourly - daytime & week day work only): <br />• 400 hours @ $68.00/hour............................................................................... $27,200.00 <br />Professional/Administrative Man-hours (Engineering Consultations, Limited Progress Meetings, Reporting, etc.): <br />We have assumed that no data entry into a density log book or into the FDOT's M.A.C. system will be required of AACE. <br />• Principal Engineer: 60 hours @ $150.00/hour............................................................... $9,000.00 <br />• Technical Secretary; 40 hours @ $55.00/ hour ............................................................... $2,200.00 <br />Soil Laboratory Testin¢: <br />• Moisture/Density Relationship (Proctor) Testing. 10 tests @ $95.00/test.......................................... $950.00 <br />• LBR Testing (Stabilized Subgrade, Base Rock); 8 tests @ $325.00/test........................................... $2,600.00 <br />• Organic Content Testing; 20 tests @ $40.00/test.............................................................. $800.00 <br />• Wash Sieve Analysis (1 inch to No. 200); 20 tests @ $105.00/test............................................... $2,100.00 <br />• Atterberg Limits Testing; 10 tests @ $98.00/test.............................................................. $980.00 <br />Limited Asphalt Testing (no coring or paving inspections included): <br />• Asphalt Laboratory Monitoring (Assume 1 nighttime paving event @ 10 hours/event); <br />- Senior Transportation/Roadway Technician; 10 hours @ $90.00/hour x 1.5 (nighttime rate) ........................ $1,350.00 <br />• Asphalt Content and Extraction/Gradation Testing (sampled hot); 6 samples @ $225.00/sample ..................... $1,350.00 <br />• Senior Transportation/Roadway Technician <br />- (Bulk sample collection & prep); 30 hours @ $90.00/hour x 1.5 (nighttime rate) .................................. $4,050.00 <br />• Snr. Project Engineer; 15 hours @ $135.00/hour............................................................ $2,025.00 <br />Concrete Testing: <br />• Compressive Strength Testing of Concrete (sidewalks, medians, curbing, etc.) <br />- 10 sets of concrete specimens @ $100.00/set............................................................ $1,000.00 <br />Anticipated Proiect Cost . $55.605.00 <br />ANDERSEN ANDRE CONSULTING ENGINEERS, INC. <br />WWW.AACEINC.COM <br />