Laserfiche WebLink
Date. Should SWDD not approve any part of the Equipment Plan, Contractor shall provide <br />a revised Equipment Plan within five (5) business Days of notification. <br />5.6.3 Changes to the Equipment Plan, other than routine replacement, must be approved in <br />writing by SWDD prior to implementation. <br />5.6.4 Contractor shall keep all equipment in good repair, appearance, and in sanitary, leak -proof, <br />clean, and odor -free condition throughout the term of this Contract. All roll -off containers, <br />compactors, and trailers must always be maintained in a road -worthy condition. <br />5.6.5 Maintenance and cleaning activities on equipment beyond those considered as a minor <br />repair shall not be performed at any CCCs. Contractor shall relocate equipment to its facility <br />for proper maintenance or cleaning. <br />5.6.6 Damaged, broken, and unsuitable equipment shall not be used or stored at any CCC or any <br />other SWDD or County property without prior written approval. The Contractor shall <br />remove such equipment within 7 business Days upon notification from SWDD. <br />5.6.7 Contractor shall use all equipment as designed and within the equipment design capacity. <br />To minimize spillage, no container shall be loaded to exceed its design capacity and the <br />transport regulations of the Department of Transportation. Where applicable, all <br />equipment shall be registered with the applicable State of Florida Agencies and shall comply <br />with requirements concerning the display of registration numbers. <br />5.6.8 Contractor may utilize SWDD assets located at any CCC. However, Contractor shall be <br />responsible (at Contractor's sole expense) for the operation, maintenance, and <br />replacement of SWDD assets that are worn or damaged during the term of the Contract. <br />Contractor assumes responsibility of SWDD assets in an "as is" condition provided at <br />Commencement Date. Should Contractor determine the need for any additional asset or <br />"fixed" asset, Contractor must obtain approval in writing by SWDD prior to installation or <br />construction. Any new fixed asset installed by the Contractor will be at the Contractor's sole <br />expense and shall remain as SWDD property at the end of this Agreement. <br />5.6.9 Contractor understands that any capital expenditure that the firm makes, or prepares to <br />make, to perform the services required by SWDD, is a business risk that the Contractor must <br />assume. The County will not be obligated to reimburse amortized or unamortized capital <br />expenditures or to maintain the approved status of any Contractor. If the Contractor has <br />been unable to recoup its capital expenditures during the time it is rendering such services, <br />it shall not have any claim upon the County. <br />5.7 Safety and Security <br />5.7.1 Contractor shall provide security for each CCC to ensure unauthorized access is deterred <br />and prevented. This shall include the use of perimeter security fencing and structures with <br />access gates and buildings properly closed and locked during non -operational hours. <br />D <br />ACTIVE: 38438749.1 <br />