My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-085
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 12:40:07 PM
Creation date
9/29/2025 12:22:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/08/2025
Control Number
2025-085
Agenda Item Number
16.B.2.
Entity Name
Republic Services of Florida, Limited Partnership
Subject
Contract Agreement for the Operations and Maintenance of Customer
Convenience Centers (CCCs) in Indian River County
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor may provide security personnel or cameras at each CCC at the Contractor's sole <br />expense. However, SWDD shall have access to the software and the data at all times. <br />5.7.2 Contractor shall be responsible for coordinating with the Indian River County Sherriff's <br />Office, Fire Department, and any other entity that may require after -hour access to a CCC. <br />At the Oslo CCC, these other entities include but not limited to Florida Power and Light (FPL), <br />Indian River Farms Water Control District (IRFWCD), and the radio tower personnel. There <br />are separate locks for each of these entities and the Contractor shall exercise caution to not <br />remove or cut their locks. <br />5.7.3 Contractor shall direct and control all traffic entering and leaving each CCC to ensure safety <br />and an efficient flow for material drop-off. <br />5.7.4 Contractor shall implement all measures necessary to control nuisances generated at the <br />CCCs to include odor, noise, dust, and vectors in accordance with applicable laws, <br />regulations, and requirements. <br />5.7.5 Contractor shall within thirty (30) Days of Effective Date, submit to SWDD the following <br />plans for approval. SWDD retains the right to approve required plans. Should SWDD not <br />approve any part of the plans, Contractor shall submit revisions to the plan within five (5) <br />business Days of notification. Any change within any plan identified below shall be <br />submitted to SWDD and approved in writing prior to implementation. <br />a) Vector and Vermin Control Plan for each CCC. This plan shall define measures to be <br />taken by Contractor to control vectors at the CCC and an implementation timeline <br />spanning the Contract term. <br />b) Odor, Dust, and Noise Control Plan for each CCC. This plan shall define measures to <br />be taken by Contractor to control odor, dust, and noise at each CCC, and an <br />implementation timeline spanning the Contract term. <br />c) Health and Safety Plan for each CCC complying with the Occupational Safety and <br />Health Act of 1970 (OSHA) and all applicable Federal and State labor laws, regulations, <br />and standards. Contractor will affirm that any work performed on County property <br />will be performed in accordance with regulatory agency requirements. The Health <br />and Safety Plan shall include a timeline for updating to reflect any changes and ensure <br />safe operational conditions for Contractor employees, CCC visitors, and the public. <br />Contractor shall deliver an updated plan to SWDD whenever changes occur. <br />The Health and Safety Plan shall include a written procedure for the immediate <br />removal to a hospital or doctor's care of any person who may be injured that requires <br />such care and for notification to SWDD of all safety issues, including accidents and <br />injuries as soon as practical after an incident has occurred. All injury documentation <br />shall be made available to SWDD upon request. <br />10 <br />ACTIVE: 3843 8749A <br />
The URL can be used to link to this page
Your browser does not support the video tag.