2025-208
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:55:51 PM
Creation date
10/21/2025 2:55:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/23/2025
Control Number
2025-208
Agenda Item Number
9.X.
Entity Name
Kimley-Horn and Associates, Inc
Subject
Engineering Services Work Order 21 for the Wabasso Repump Station Conversion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
three (3) days of performance testing to complete drawdown testing. <br />Consultant will furnish and install pressure transmitter at the existing pump station and collect discharge <br />data for a minimum of 30 days. <br />Consultant will utilize the existing sewer system hydraulic model prepared by others to establish existing <br />and future flows and hydraulics of the sewer system and determine present and future configuration and <br />operation of the pump station for pump size selection, and the impacts to the existing two (2) forcemains <br />upstream of the proposed WIBPS. Consultant will utilize field test data to calibrate the hydraulic model. <br />Consultant's proposal includes coordination time with IRCDUS Integrated Water Master Plan (IWMP) <br />Consultant to obtain record information, hydraulic model files, etc. This proposal assumes up to eight (8) <br />hours of senior professional time and twelve (12) hours of professional time for coordination. <br />Consultant will evaluate impacts to the existing upstream forcemains exhibited through imposing <br />additional back pressure through conversion of re -pump to inline boosting. Consultant will coordinate <br />with IRCDUS for any potential testing requirements to better understand existing force main condition. <br />Consultant will visit the WIBPS site up to three (3) times to confirm survey, take field dimensions, <br />document equipment condition and assemble information necessary to prepare the project design. <br />Soft -digs: Consultant will coordinate and provide up to six (6) subsurface investigations using soft -dig <br />technique for anticipated U/G conflicts. Consultant will utilize the services of Inframap to perform the <br />subsurface utility exploration. <br />Survey: Consultant will prepare topographic survey of the wastewater site limited to the areas of the <br />proposed improvements. It is assumed all work will be constructed on IRCDUS owned land. Consultant <br />will utilize William B. Zentz & Associates, Inc. for professional surveying services. <br />The survey scope for the plant site consists of the following items: <br />• Obtain existing elevations within a 100 -ft radius and along existing influent forcemains <br />• Location of the existing above ground structures and equipment, and soft -dig locations at the <br />plant site. <br />• Horizontal location of perimeter fence at 20 -foot intervals and fence comers <br />• Building slabs at all comers near the ground surface, edge of pavement, sidewalks, inlets, <br />swales, manholes inverts of sewer and drainage pipes, valve boxes and top of valve nuts <br />• Ground elevations at a 20 -foot grid and within 10 feet near structures and buildings. <br />• The vertical datum elevations will be referenced to NAVD 88 datum. <br />• Horizontal datum to be NAD 83/90 <br />Geotechnical: Consultant will utilize the services of WIRX Engineering to conduct geotechnical <br />engineering evaluation for the planned work. The scope includes determining if the bearing capacity and <br />other soil characteristics are suitable to construct the proposed structures. Three (3) SPT boring will be <br />conducted near the inline booster station foundation and electrical building to a depth of 25 feet. <br />Laboratory testing to determine grain size distribution of the subsoils. <br />Perform a geotechnical analysis and prepare a geotechnical engineering report which will include <br />the following: <br />o Overall site map showing soil boring locations. <br />o Overall site and surface conditions <br />o Ground water level elevations <br />o Soil boring profiles showing soil identifications, depth, groundwater, and standard <br />penetration "N values", and soil description. <br />o Soil classification per USCS <br />K:\WPB_Civil\General\Black\Florida\IRCU\NWWTP Inline BPS\20250813 - WIBPS Scope.doex Page 2 <br />