My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-208
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:55:51 PM
Creation date
10/21/2025 2:55:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/23/2025
Control Number
2025-208
Agenda Item Number
9.X.
Entity Name
Kimley-Horn and Associates, Inc
Subject
Engineering Services Work Order 21 for the Wabasso Repump Station Conversion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Results of soil laboratory testing <br />o Site Preparation recommendations <br />o Foundation design recommendations <br />Consultant will prepare a draft preliminary design report document for IRCDUS review. Consultant will <br />attend one (1) review meeting and finalize and submit the document based on IRCDUS feedback and <br />review comments. <br />Task I Deliverables: <br />• Estimate of Probable Cost and Review of IRCDUS budget <br />• Preliminary Design Report <br />• Final Design Report <br />Task 2 — Inline Booster Pump Station Design Documents <br />Consultant will design yard piping improvements to route the existing forcemains to the new pump <br />station and connect to the 16 -inch main downstream of the existing station. Consultant will coordinate <br />with IRCDUS for testing of the existing forcemains as part of the condition assessment. <br />Consultant will prepare structural design for the proposed pump station building. The 2023 version of the <br />Florida Building Code (FBC) has been adopted and was effective December 31, 2023. It is assumed that <br />these improvements listed herein will be affected and need to be designed in accordance with the current <br />code. Consultant will design the proposed electrical and generator building. Consultant will design hoist <br />system for pump removal and installation. <br />Consultant will prepare mechanical design package for indoor generator, exhaust system ventilation, <br />louver and duty fan selection. Consultant will design fuel system for proposed emergency generator. <br />Consultant will perform hydraulic design calculations to select the new wastewater pumps and size the <br />process piping and valves. Consultant will utilize the selected equipment and prepare the mechanical <br />process design. Consultant will coordinate with vendors for equipment selection and sizing. <br />Consultant will prepare mechanical design calculations for the HVAC system for the electrical equipment <br />and VFD cooling needs in the electrical room. <br />Consultant's will prepare project contract deliverables for submittal to IRCDUS. Deliverables will <br />include Opinion of Probable Construction Cost (OPCC), plans and technical specifications. It is <br />estimated that approximately 35 drawings will be prepared. The following sheets are anticipated: <br />• Cover Sheet <br />• General Notes and Abbreviations <br />• Existing Site Plan <br />• Proposed Site Plan <br />• Horizontal and Vertical Control <br />• Yard Piping Improvements Plan <br />• Yard Piping Improvement Details <br />• Structural Foundation Plan <br />• Structural Building Plans and Schedules <br />• Structural Building Sections and Details <br />• Structural Typical Section and Details <br />• Structural Building Elevations <br />• Hoist Beam Plan and Details <br />• Fuel Tank Pad Plan and Details <br />• Site Piping Plan <br />K:\WPB_Civil\General\Black\Florida\IRCU\NWWTP Inline BPS\20250813 - WIBPS Scope.docx Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.