My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-208
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:55:51 PM
Creation date
10/21/2025 2:55:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/23/2025
Control Number
2025-208
Agenda Item Number
9.X.
Entity Name
Kimley-Horn and Associates, Inc
Subject
Engineering Services Work Order 21 for the Wabasso Repump Station Conversion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Consultant will develop an estimate of time to complete (ETC) the construction or implementation <br />phase of the project. The estimate will be based on preparation of the dependent tasks and activities using <br />the CPM (critical path method) technique to estimate the potential shortest duration. The schedule shall <br />identify dependencies with external projects as required. <br />The CPM schedule will be included in the solicitation package. The solicitation package shall include <br />specific instructions for Respondents to submit a proposed schedule that may elaborate the Consultant's <br />ETC. The Consultant bid review services shall include reviews of the proposed schedules. Upon award, <br />the Consultant's Construction phase services shall include schedule negotiation with the awardee to reach <br />agreement and set the Contract Time. <br />Client will advertise all bidding documents and addendums and pay all associated costs. <br />Consultant will attend one (1) pre-bid meeting with the Client and potential Bidders/Contractors to <br />perform a site walk and discuss the project. <br />Consultant will respond to a reasonable number of questions from Contractor's during the bid process. <br />This scope of services assumes that up to three (3) addenda will be issued during the bid phase. <br />Consultant will review bids for accuracy and completeness. Consultant will prepare a bid review <br />summary that tallies the bids and identifies the lowest price and most responsive bidder. <br />Task 4 Deliverables: <br />• Draft bid solicitation documents for IRCDUS and Purchasing <br />• Final bid solicitation documents for IRCDUS and Purchasing <br />• Project Estimate of Time to Complete (ETC) <br />• Addendum Responses, up to three (3) included <br />• Bid review letter <br />Task 5 — Project Management and Meetings <br />Consultant will provide coordination for the duration of the project design, including plan review and <br />design review meeting attendance, design progress meetings, and status meetings during the progress of <br />the project. It is anticipated that approximately six (6) meetings will be held and attended by Consultant. <br />Consultant will prepare minutes from each meeting and distribute to the project team. The following <br />meetings are anticipated: <br />• Design kickoff meeting <br />• Draft Basis of Design Report Review Meeting <br />• 75% Design Review Meeting (Preliminary) <br />• 100% Design Review Meeting <br />• Risk Management Plan Meeting <br />• Bid document review meeting with IRCDUS and Purchasing Department <br />Consultant will also provide project management for the project, consisting of coordination, planning and <br />scheduling of project tasks and deliverables, meeting attendance, coordination of staffing on project, <br />coordination with subconsultants, administrative work including filing of all documentation, meeting <br />minutes, letters, etc. The Consultant will provide a status report with each invoice for each period <br />covered by the invoice. The report will provide accomplishments for each task in the SOW and status of <br />the schedule including plan versus actual. A forecast to complete date will be provided. It is estimated <br />that approximately forty (40) hours of administration time and thirty (30) hours of professional time will <br />be required for this task. <br />The Consultant will establish a cloud -based platform for the project team members, both Consultant and <br />designated IRCDUS staff. The portal will be utilized throughout the project to store, share, and manage <br />K:\WPB_Civil\Genera]\Black\Florida\IRCU\NWWTP Inline BPS\20250813 - WIBPS Scope.docx Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.