Laserfiche WebLink
project artifacts efficiently and securely. <br />The Consultant shall develop a project risk register (PRR) early upon commencing the project. The early <br />PRR may be based on key assumptions made by the Consultant during the scoping (reference List of <br />Assumptions below) and is used to identify risk that will not carry forward into the Build phase. At this <br />stage, the early risk identification will determine if additional engineering is required. To finalize the <br />PRR, a risk management planning workshop will be held with IRC staff. <br />Task 5 Deliverables: <br />• Meeting Agendas and Minutes (x6) <br />• Cloud -based sharefile for project file sharing <br />• Pre -design PRR <br />• Preliminary Design Report PRR <br />• 75% Design PRR <br />• Final PRR <br />TASK 6 — ENVIRONMENTAL SUPPORT SERVICES <br />In accordance with the Florida Fish and Wildlife Conservation Commissions (FWC) guidelines, one (1) <br />100% gopher tortoise survey will be performed to locate potentially occupied and abandoned gopher <br />tortoise burrows within the project area and the adjacent areas. Burrows will be located with GPS and <br />activity status will be noted. The results of the survey will be summarized in a graphic depicting the <br />burrows identified during the field survey. <br />Per the guidelines, the 100% survey is only valid for 90 days. If gopher tortoises are found and more than <br />90 -days elapses between the 100% survey and project construction, another 100% survey will be <br />required. If no gopher tortoise burrows are found, another survey is recommended after the installation of <br />silt fence by the contractor to assure no new burrows have been created within the project footprint. <br />If any potentially occupied or active burrows identified during the 100% survey will be impacted by the <br />proposed development, a gopher tortoise relocation permit from the FWC and gopher tortoise relocation <br />will be required. Permitting and relocation can be provided as an additional service. <br />Task 6 Deliverable: <br />• Gopher Tortoise Survey Graphic <br />FEE SCHEDULE <br />We will provide these services in accordance with the Continuing Contract Agreement for Consulting <br />Engineering Services #2023015 dated May 21, 2023, by and between INDIAN RIVER COUNTY, a <br />political subdivision of the State of Florida ("COUNTY") and Kimley-Horn and Associates, Inc., <br />("Consultant"). <br />The Consultant will provide professional services for a lump sum fee as follows: <br />Task No. <br />Description <br />Fee <br />1 <br />Preliminary Engineering & Due Diligence <br />$ <br />104 029.58 <br />2 <br />Inline BPS Design Documents <br />$ <br />280,278.21 <br />3 <br />Permitting <br />$ <br />15 746.52 <br />4 <br />Bid Phase Services <br />$ <br />20 972.36 <br />5 <br />Project Mana ement and Meetings <br />$ <br />38 660.16 <br />6 <br />Environmental Support Services <br />$ <br />4,937.12 <br />TOTAL $ 464,623.95 <br />K:\WPB—Civil\General\Black\Florida\IRCU\NWVv7P Inline BPS\20250813 - WIBPS Scope.docx Page 6 <br />