My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-208
CBCC
>
Official Documents
>
2020's
>
2025
>
2025-208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 2:55:51 PM
Creation date
10/21/2025 2:55:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/23/2025
Control Number
2025-208
Agenda Item Number
9.X.
Entity Name
Kimley-Horn and Associates, Inc
Subject
Engineering Services Work Order 21 for the Wabasso Repump Station Conversion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDITIONAL SERVICES <br />The following services are not included in the Scope of Services for this project, but may be required <br />depending on circumstances that may arise during the execution of this project. Additional services <br />include, but may not be limited to the following: <br />• Construction phase services (Phase 2) <br />• Additional permitting <br />• Permit application processing fees <br />• FWC permitting, tortoise relocation <br />• Off-site improvements <br />INFORMATION PROVIDED BY CLIENT <br />• Access to site <br />• Record drawings <br />• Pump performance curves <br />• Meeting attendance <br />• Workshop attendance and design input <br />• Review of deliverables <br />• Permit application processing fees <br />• Minimum three (3) months data of the following: <br />o North pump station wetwell level <br />o North pump station flow data <br />o North pump station discharge pressure data <br />o Manifolded pump station runtime data <br />RESOURCE PLAN <br />The following key staff, subconsultants and subject matter experts will be utilized to execute the scope of <br />services outlined herein: <br />• Project Manager — Nick Black, P.E. (Mechanical, Civil and Process) <br />• Deputy Project Manager — Bert King, P.E. <br />• Project Engineer — Casey Long, P.E. (Structural) <br />• Project Engineer — Mike Guida, P.E. (Electrical) <br />• Project Engineer — Jose Reyes (Electrical) <br />• Project Analyst — Chris Sullivan, E.I. <br />• Project Analyst — Sarah Bolles, E.I. <br />• CAD Designer — Juan Rodas <br />• Senior QA/QC and Subject Matter Expert — Jason Lee, P.E. <br />K:\WPB_Civil\General\Black\Florida\IKCU\NWWTP Inline BPS\20250813 - WIBPS Scope.docx Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.