Exhibit B - Proposed Schedule <br />Task # <br />Month <br />Subtask 1 2 31 41 5 ti 7 8 9 10 11 12 <br />Model Calibration, Field T, s (i m <br />Field Investigations <br />1 <br />Subs - Survey, soft -digs, geotech <br />Draft PDR Submittal <br />Final PDR Submittal <br />Design yard piping <br />Design structural package <br />Design mechanical package <br />2 <br />DesignHVAC package <br />Design Electrical <br />Preliminary Design Deliverables <br />Final Design Deliverables <br />Administrative Site Plan - CDD <br />3 <br />FDEP Permit App <br />ETC <br />4 <br />Draft Bid Docs <br />Final Bid Docs <br />Advertisement and Award <br />5 <br />1 Project Management <br />6 <br />JGT Survey and Graphic <br />Notes: <br />Task 1 shall begin after all operating data has been received from IRCDUS and is independent from the contractual NTP. This information is critical path for the project <br />Consultant does not control bid advertisement schedule or duration it takes for contract award <br />All scheduled items are assuming prompt deliverable review by IRCDUS. Delays in deliverable review beyond 2 weeks extend schedule accordingly <br />This schedule proposes times to submit permit applications and makes reasonable assumptions regarding review time. The consultant makes no guarantees regarding permit application review timeframes. <br />