Laserfiche WebLink
10.2.3 SWDD may assess the following administrative charges pursuant to this Article: <br />a) Failure to Apply Permitted Cover Materials. SWDD shall notify the Contractor that <br />permitted cover materials have not been properly applied and if not remedied <br />within twenty-four (24) hours of notice, a penalty of $500 per day will be assessed <br />until such time SWDD determines the deficiencies have been resolved. <br />b) Application of Excess Cover Materials. If the Contractor applies cover materials <br />over six -inches for daily cover and/or twelve -inches for intermediate cover, the <br />SWDD shall give the Contractor notice. If the Contractor fails to fix the issue within <br />twenty-four (24) hours of notice from SWDD, a penalty of $500 per day shall be <br />assessed until SWDD determines the issue has been resolved. <br />c) Litter Control. If the Contractor fails to adequately control litter as required by <br />this Agreement, SWDD shall provide notice to the Contractor. If the Contractor <br />fails to fix the issue within twenty-four (24) hours of notice from SWDD, a penalty <br />of $500 per day shall be assessed until SWDD determines the issues have been <br />resolved. <br />d) Stormwater Control. If the Contractor fails to maintain drainage structures, <br />swales, ditches, properly place and repair sediment fencing and related <br />stormwater conveyance structures on the site as required by the Agreement, <br />SWDD shall provide notice to the Contractor. If the Contractor fails to fix the <br />issues within twenty-four (24) hours of notice from SWDD, a penalty of $500 per <br />day shall be assessed until SWDD determines the issues have been resolved. <br />e) Road Maintenance. If the Contractor fails to maintain site roads as required by <br />the Agreement, SWDD shall provide notice to the Contractor. If the Contractor <br />fails to remedy the issues within twenty-four (24) hours of notice from SWDD, a <br />penalty in the amount of $500 per day shall be assessed until SWDD determines <br />the issues have been resolved. <br />f) Dust Control. If the Contractor fails to provide dust -control throughout the site as <br />required by the permit or this Agreement, after one hour (1) notice from SWDD, <br />penalties shall be assessed in the amount of $500 for each hour thereafter until <br />SWDD determines the issues have been resolved. <br />g) General Permit Conditions. If the Contractor is notified of a permit condition <br />violation and fails to remedy the violation within twenty-four (24) hours of notice <br />by SWDD, a penalty in the amount of $500 per day shall be assessed until such <br />time SWDD determines the issues have been resolved. This penalty is separate <br />from any penalty that may be assessed by the regulatory agency for violating a <br />permit condition. <br />Indian River County Landfill Operating Agreement Final Page 25 of 42 <br />