For linear assets, CONSULTANT will develop estimates of remaining useful life (Mk), <br /> likelihood of failure(LOF), consequence of failure(COF), and overall risk using desktop <br /> data only from the COUNTY and available external data sources. <br /> CONSULTANT will discuss findings and conclusions with the COUNTY at the Asset <br /> Management and Condition Assessment Workshop and will compile them into Draft <br /> IWMP Module 2: Existing System Performance. <br /> 3.4.3 Physical Condition Assessment Preparation Workshop (2 hours, in- <br /> person) <br /> CONSULTANT will facilitate a two-hour, in-person workshop with management and <br /> operations to develop a prioritized list of lift stations for CONSULTANT to visit during <br /> physical condition assessment. CONSULTANT will not visit all lift stations but will <br /> develop a template with which the COUNTY can assess remaining lift stations in the <br /> future. <br /> 3.4.4 Physical Condition Assessment—Vertical Assets <br /> CONSULTANT will perform a visual only. multi-discipline (process, mechanical, <br /> structural, electrical, instrumentation) condition assessment of existing conditions at the <br /> following facilities: <br /> • Oslo Water Treatment Plant <br /> • Hobart Water Treatment Plant <br /> • Central Wastewater Treatment Facility <br /> • South Wastewater Treatment Facility <br /> • West Wastewater Treatment Facility <br /> • Blue Cypress Wastewater Treatment Facility <br /> • Biosolids Facility <br /> • Up to forty (40) vertical repump facilities <br /> CONSULTANT assumes that major process equipment, HVAC equipment, electrical <br /> equipment, structures, and controls equipment will be assessed. CONSULTANT will <br /> perform site visits in a single trip to occur over five consecutive days to Complete the <br /> visual assessment. CONSULTANT will develop a field data collection application to be <br /> used to record photographs and observations. CONSULTANT will use the Asset <br /> Inventory developed in Task 3.4.1 to build the field data collection tool. CONSULTANT <br /> will record observations for Level 6 Assets as defined id the COUNTY's existing asset <br /> hierarchy. CONSULTANT will coordinate with the COUNTY to review the 2018 Arcadis <br /> 'Condition and Risk Assessment Guidelines: Vertical Assets" document and any <br /> changes that the COUNTY would like to make to the condition assessment criteria, <br /> scoring, and weighting defined therein. CONSULTANT will compile condition <br /> observations, performance input from COUNTY staff, and desktop data reviewed in <br /> Task 3.4.2 to assign a remaining useful life (RUL) to all defined assets. <br /> CONSULTANT will provide up to six(6) persons for each one-week condition <br /> assessment mobilization. COUNTY will make available operations and maintenance <br /> staff familiar with condition and maintenance of pumping facilities. During the field work, <br /> no tanks will be drained, and no CONSULTANT personnel will enter Occupational <br /> Safety and Health Administration (OSHA) defined confined spaces. No non-visual <br /> assessment, such as amperage draw or temperature draw, will be performed. <br /> Schedule and cost assumes four(4) weeks of condition assessment. <br /> 9 309 <br />