Laserfiche WebLink
1. <br />M <br />That, prior to the issuance of a land development permit, the <br />developer shall obtain from the environmental planning section <br />approval of a final littoral zone planting plan. <br />2. That, prior to the issuance of a land development permit, all <br />county and jurisdictional agency permits necessary to fill the <br />project site's wetlands must be obtained and submitted to <br />planning staff. <br />3. That, prior to the issuance of a land development permit, the <br />applicant shall obtain approval from planning staff of a final <br />landscape plan for the Type "C" buffer along the project <br />site's 33rd Street frontage. <br />4. That, prior to the issuance of a land development -permit, the <br />applicant shall obtain a mining permit exemption subject to <br />the criteria of mining ordinance section 934.04(7)(b). <br />5. That, prior to the issuance of a certificate of completion for <br />the project, the 5' sidewalk along 33rd Street and the Type <br />"C" buffer along the south property line shall be constructed, <br />and deemed acceptable by county staff. <br />6. That lot open space calculations certified by a Florida <br />registered land surveyor as meeting the 30% open space <br />requirement shall be submitted with each building permit <br />application for each residence within the project. <br />7. That, prior to the issuance of a certificate of completion, a <br />right -turn lane shall be constructed at the project's entrance <br />in a manner acceptable to the county traffic engineer.__ <br />Planning Director Stan Boling reviewed the project and advised <br />the Board that on the south side, the front and rear setbacks will <br />be reduced from 25 to 20 feet on 33rd Street. He also noted that <br />the Planning and Zoning Commission has recommended denial mainly <br />due to the degree of departure in size on the interior lots, <br />although staff feels the project is an acceptable one. <br />Chairman Adams noted that the project is similar to <br />Stonebridge and questioned the difference in the Planning and <br />Zoning Commission recommendation. <br />Director Boling responded that the Stonebridge project <br />contains 2.2 -units per acres while this project contains 2.9 units <br />per acres. Other differences include the fact that the interior <br />lots are smaller for this project. However, the outside perimeter <br />is completely standard except for the 33rd Street lots. <br />The Chairman opened the public hearing and asked if anyone <br />wished to be heard in this matter. <br />Attorney Bruce Barkett, representing the applicant, pointed <br />out that the adjacent property to the east is zoned RS -6 and these <br />lots exceed the requirements of RS -6 zoning. The plan for the 990 <br />feet fronting on 33rd Street has been modified from a wall to a 3 <br />foot berm with a double hedge and understory and canopy trees. <br />DECEMBER 17, 1996 99 '� <br />