My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/21/1997
CBCC
>
Meetings
>
1990's
>
1997
>
1/21/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:02 PM
Creation date
6/17/2015 9:22:38 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/21/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Existing Demand Total Available Positive <br />Roadway Existing Vested Segment Segment Project Concurrency <br />Segment Volume Volume Demand Capacity Demand Determination <br />1920E <br />1120 <br />768 <br />1888 <br />1222 <br />37 Y <br />1920W <br />1294 <br />708 <br />2002 <br />1108 <br />37 Y <br />1925E <br />1170 <br />1367 <br />2537 <br />303 <br />30 Y <br />1925W <br />1288 <br />1336 <br />2634 <br />216 <br />30 Y <br />1930E <br />1116 <br />1455 <br />2571 <br />269 <br />11 Y <br />1930W <br />1209 <br />1429 <br />2638 <br />202 <br />11 Y <br />301ON <br />288 <br />127 <br />415 <br />345 <br />8 Y <br />30105 <br />336 <br />127 <br />463 <br />297 <br />8 Y <br />3015N <br />418 <br />231 <br />649 <br />111 <br />10 Y <br />30155 <br />364 <br />230 <br />594 <br />166 <br />10 Y <br />302ON <br />460 <br />290 <br />750 <br />130 <br />13 Y <br />30205 <br />440 <br />291 <br />739 <br />149 <br />13 Y <br />3025N <br />510 <br />616 <br />1126 <br />764 <br />14 Y <br />3025S <br />564 <br />614 <br />1178 <br />712 <br />14 Y <br />- Water <br />With the proposed zoning, the subject property could accommodate <br />159 residential units, resulting in water consumption at a rate of <br />159 Equivalent Residential Units (ERU), or 39,750 gallons/day. <br />This is based upon a level of service of 250 gallons/ERU/day. <br />Development on the subject property would be served by the South <br />County Reverse Osmosis Plant which currently has a remaining <br />capacity of approximately 2,000,000 gallons/day and can accommodate <br />the additional demand generated by the proposed rezoning. <br />- Wastewater <br />Based upon the most intense use allowed under the proposed zoning, <br />development of the property will have a wastewater generation rate <br />of approximately 159 Equivalent Residential Units (ERU), or 39,750 <br />gallons/day. This is based upon the level of service standard of <br />250 gallons/ERU/day. County wastewater service is available to the <br />site from the West Regional Wastewater Treatment Plant, which <br />currently has a remaining capacity of more than 200, 000-galloris/day <br />and can accommodate the additional wastewater generated by the <br />subject request. <br />- Solid Waste <br />Solid waste service includes pick-up by private operators and <br />disposal at the county landfill. The county's adopted level of <br />service standard for landfill capacity is 2.37 cubic yards/person/ <br />year. With the county's average of approximately 2.3 persons/unit, <br />a 159 unit residential development would be anticipated to house <br />approximately 366 people (2.3 X 159). For the subject request to <br />meet the county's adopted level of service standard of 2.37 cubic <br />yards/person/year, the landfill must have enough capacity to <br />accommodate approximately 867 (366 X 2.37) cubic yards/year. <br />A review of the solid waste capacity for the active segment of the <br />county landfill indicates the availability of more than 850,000 <br />cubic yards. The active segment of the landfill has a 2 year <br />capacity, and the landfill has expansion capacity beyond 2010. <br />Based on the analysis, staff determined that the courty landfill <br />can accommodate the additional solid waste generated by the site <br />under the proposed zoning district. <br />- Drainage <br />All developments are reviewed for compliance with county stormwater <br />regulations which require on-site retention, preservation of <br />floodplain storage and minimum finished floor elevations. In <br />addition, development proposals must meet the discharge <br />24 BOOK 100 PAGE J�o <br />January 21, 1997 <br />M M M <br />
The URL can be used to link to this page
Your browser does not support the video tag.