Laserfiche WebLink
Boor, 10i PnE 451 <br />Since the bids received were over budget, staff and the Architect have met with the <br />low bidder, Chilberg-Mayfield Inc., to determine if the cost could be reduced. The <br />following changes are or000sed- <br />Bid Item # <br />Orioinal Bid <br />Reductions <br />Revised Cost <br />1. Reconstruct Baseball field <br />$ 86,026.00 <br />1 a. Delete clearing, removing <br />existing grass, and <br />drainage swale. Work to <br />be performed by County <br />$ 6,925.00 <br />crews. <br />1 b. Delete flagpole - Work to <br />be done in-house <br />$ 1,300.00 <br />1 c. Reduce fencing cost <br />$ 972.25 <br />Subtotal 1 <br />$ 76,828.75 <br />2. Baseball Field Lighting <br />$ 83,160.00 <br />2a. Provide alternate lighting <br />System <br />$18,504.00 <br />Subtotal 2 <br />$ 64,656.00 <br />3. Basketball Court Lighting <br />$ 25,465.00 <br />$ 25,465.00 <br />4. Entrance Road Lighting <br />$ 8,700.00 <br />$ 8,700.00 <br />5. Performance Bond <br />$ 2,928.00 <br />5a. Reduce Bond Amount <br />$ 323.71 <br />Subtotal 5 <br />$ 2,604.29 <br />Subtotal - Baseball Bid <br />$206,279.00 <br />$ 28,024.96 <br />$ 178,254.04 <br />6. Alternate Bid # 1 - Bleachers(4) <br />$ 17,268.00 <br />Slabs, and Walks <br />6a. Delete 2 of 4 <br />$ 9,334.00 <br />Bleachers with slab and <br />concrete behind homeplate <br />Subtotal 6 <br />$ 7,934.00 <br />7. Alternate Bid #2 -Covered <br />$ 27,400.00 <br />$ 27,400.00 <br />Picnic Shelter <br />8. Alternate Bid # 3 - Pressbox, <br />$ 76,816.00 <br />8a. Revise plywood specs. <br />$ 322.00 <br />8b. Revise spec. for roll down <br />$ 4,847.00 <br />windows <br />8c. Delete drawers & base <br />$ 3,650.00 <br />cabinets. Revise shelves, <br />etc. <br />Subtotal 8 <br />$ 67,997.00 <br />9. Septic Tank <br />$ 2,145.00 <br />$ 2,145.00 <br />TOTALS <br />$ 329, 908.00 <br />$ 46,177.96 <br />$283,730.04 <br />The following alternatives are presented: <br />Alternative No. 1 <br />Award the Base bid and Alternates 1-3 to Chilberg-Mayfield, Inc. in the total bid <br />amount of $329,908. At the same time, issue Change Order No. 1 to reduce the <br />contract amount by $46,177.96 for a revised contract of $283,730.04.. Also, since the <br />alternate bid items were not covered by the performance and payment bonds, an <br />additional $1500 for bonds is required. The total Contract would be $285,230.04. <br />50 <br />MAY13 1997 <br />