My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/20/1997
CBCC
>
Meetings
>
1990's
>
1997
>
5/20/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:04 PM
Creation date
6/17/2015 10:09:17 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/20/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Staff recommends the following actions be taken: <br />1. Approve Change Order No. 2. <br />2. Release final payment in the amount of $148,439.29 which includes the <br />10% retainage. <br />Funding for the road improvements is from Account #315-214-541-066.51. <br />ON MOTION by Commissioner Adams, SECONDED by <br />Commissioner Gmn, the Board (4-0, Commissioner Tippin <br />being absent) unanimously approved Change Order #2 and <br />release of the final payment in the amount of $148,439.29 to <br />Ranger Construction, pursuant to stafs recommendations. <br />DOCUMENTS ARE ON FILE IN THE OFFICE <br />OF THE CLERK TO THE BOARD <br />11.G.2. ROCKRIDGE SUBDIVISION -16' STREET -DRAINAGE <br />EM PROVEMENTS - DAMES & MOORE - DOT <br />The Board reviewed a Memorandum of May 9, 1997: <br />TO: James E. Chandler, <br />County Administrator <br />FROM: James W. Davis P.E., s <br />Public Works Director Vim. <br />J <br />SUBJECT: Rockridge Subdivision/16th Street Drainage Improvements <br />REF. LETTER: Michael Mills, Dames and Moore, Inc. to James Davis dated May 1, 1997 <br />DATE: May 9, 1997 <br />DESCRIPTION AND CONDITIONS <br />The Florida DOT is currently under contract with Dames and Moore, Inc. to design the <br />installation of a large drainage culvert along the 16'h Street ditch through the Rockridge <br />Subdivision. The preliminary design is complete, and the project includes connection of <br />fourteen existing lateral storm sewer pipes within the Rockridge Subdivision to the <br />proposed 16'" Street box culvert. This connection is proposed by replacing only one 8' <br />MAY 20, 1997 <br />83 60�R 101. PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.