My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/8/1997
CBCC
>
Meetings
>
1990's
>
1997
>
7/8/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:05 PM
Creation date
6/17/2015 10:01:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/08/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r � � <br />ON MOTION by Commissioner Adams, SECONDED BY <br />Commissioner Ginn, the Board unanimously authorized staff to <br />proceed with the design and permitting, approved the contract with <br />Driveways, Inc, in the amount of $3,944.60, and authorized the <br />Chairman to execute same, as recommended in the Memorandum. <br />AGREEMENT IS ON FILE IN THE <br />OFFICE OF THE CLERK TO THE BOARD <br />11.H.2. SEBASTIAN WATER EXPANSION PHASE 2 ASSESSMENT <br />REQUEST TO INCLUDE MAIN STREET EAST TO LOUISIANA AVENUE <br />— MASTELLER, MOLER & REED, INC. <br />The Board reviewed a Memorandum dated June 25, 1997: <br />DATE: JUNE 25, 1997 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: JAMES W. DAVIS, P.E. <br />INTERIM DIRECTOR OF UTILITY SERVICES <br />PREPARED MICHAEL C. HOTCHKISS, P.E. 94 <br />AND STAFFED ENVIRONMENTAL ENGINEER <br />BY: DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: SEBASTIAN WATER EXPANSION -PHASE 2 ASSESSMENT <br />REQUEST TO INCLUDE MAIN STREET EAST TO LOUISIANA <br />AVENUE <br />INDIAN RIVER COUNTY PROJECT NO. UW -96 -20 -DS <br />BACKGROUND <br />On March 25, 1997, the Board of County Commissioners approved a <br />contract for survey services with Masteller, Moler and Reed, Inc. <br />in the amount of $144,900.00 for the above -referenced project (see <br />attached agenda item and minutes to the meeting). The survey is <br />underway and approximately 50% complete. <br />On June 6, 1997, Thomas Frame, City Manager of Sebastian requested <br />that water service be extended to the City's administrative offices <br />located along Main Street (just west of Louisiana Avenue) during <br />the Phase 2 assessment (see attached letter). Presently, a water <br />main is being constructed along Louisiana Avenue from CR 512 to <br />Main Street. A loop feed can be provided to the Louisiana Avenue <br />water system from the Phase 2 water main by extending a line from <br />Bob Circle east along Main Street to Louisiana Avenue (see attached <br />map). This extension will provide water service to the City's <br />33 <br />JULY 891997®nK02 PACE U <br />
The URL can be used to link to this page
Your browser does not support the video tag.