My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/12/1997
CBCC
>
Meetings
>
1990's
>
1997
>
8/12/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:05 PM
Creation date
6/17/2015 10:05:41 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/12/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BQOK M PAGE 283 <br />Of the total 286 parking spaces proposed, 248 spaces are proposed in the northern portion <br />of the site, with the northernmost edge of parking spaces to be located 20' from the northern <br />property line. Within that 20' setback, there is an existing 10' wide Type "B" buffer with a <br />landscaped berm that was constructed under the approved 1994 site plan. In the southeast <br />comer of the site, 38 "staff only" spaces are proposed. <br />11. Landscaping & Buffering Plan: The landscape plan is in conformance with Chapter 926 <br />landscaping and buffering requirements. This includes depiction of a Type "C" buffer which <br />is required adjacent to the residentially designated properties along the north, south, and west <br />boundaries -of the subject site. A 10' wide Type "B" buffer and landscaped berm has already <br />been established along the northern site boundary, adjacent to Sandpointe Lane. <br />12. Lighting: The applicant is not proposing to change any of the existing lighting for the athletic <br />fields. There will be new site lighting for the area of new construction, including the parking <br />lot proposed to be located adjacent to the north property line. The applicant has indicated <br />on the site plans that all new lighting will be shielded, and the source of illumination will not <br />be visible from off-site. These provisions will meet county standards regarding light shielding. <br />13. Utilities: The school will continue to be serviced by City of Vero Beach water and sewer <br />facilities. <br />14. Concurrency: Concurrency for schools is based on enrollment. Since the proposed <br />expansion will increase enrollment, a concurrency certificate is required. The conceptual plan <br />lists the present enrollment at 375 students which will increase to 540. Therefore, the <br />applicant is required to obtain a concurrency certificate prior to building permit issuance, and <br />has executed a concurrency acknowledgment agreement. Thus, concurrency requirements <br />related to site plan approval are satisfied. <br />15. Environmental Issues: Previously, St. Edwards established a 6,100 square foot upland <br />conservation area. This conservation area exceeded the site's native upland conservation area <br />requirement which was related to a previous site plan approval. That easement was <br />established based on 10% of the overall site's total native upland area of 60,000 square feet. <br />Since the construction proposed with the current site plan request will impact the existing <br />conservation easement, the applicant is proposing to relocate and increase the conservation <br />easement to cover an area of 9,150 square feet. The 9,150 square foot area will satisfy the <br />upland set-aside requirements applicable to the site. Staff has no objection to relocation of <br />the conservation easement. Prior to site plan release, the conservation easement will need to <br />be released and relocated as depicted on the site plan. <br />The site's native upland habitat area consists of a coastal hammock located close to SR A -1- <br />A. Although the new construction will result in destruction of a portion of the hammock, <br />the proposed site plan and conservation easement will also preserve a portion of the hammock <br />adjacent to SR A -1-A. <br />The applicant is constructing a wet stormwater detention facility at the west end of the site. <br />Because the lake area exceeds half an acre, littoral zone plantings are required The applicant's <br />plans make provisions for the littoral zone planting. <br />CEI <br />August 12, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.