My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/18/1997
CBCC
>
Meetings
>
1990's
>
1997
>
11/18/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:20 PM
Creation date
6/17/2015 10:24:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/18/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vince Bruno stated that he had been asked by the Summerplace homeowners to get <br />involved and speak on their behalf. His concern and interest was to represent Dr. Simpson, <br />who owns one of the remaining homes that have not yet had their seawall completed by <br />Cangianelli. He advised that the homeowners wish to contract directly with Cangianelli. He <br />explained that the limitations placed by the Board October 21, 1997 were too strict. He <br />asked the Board to re-examine the completion time restriction and allow Cangianelli to use <br />Wabasso Park for a staging area. <br />Administrator Chandler explained the restrictions the Board developed at their <br />meeting of October 21, 1997. The draft agreement outlining those terms was sent to <br />Cangianelli. Staff was approached recently by Dr. Parvus with the letter above. The <br />contract with Cangianelli was not finalized and the fundamental change being requested by <br />the property owners is to shift responsibility and accountability from Cangianelli to the <br />property owners based on the provisions in the agreement they have with Cangianelli. <br />Administrator Chandler also noted some changes in the terms the property owners are <br />requesting in their letter. <br />Mr. Bruno stated that he had recently met with Mr. Cangianelli and felt sure that he <br />would be able to "keep the reins on Mr. Cangianelli" and stated he would accept that <br />responsibility. <br />Commissioner Adams stated her recollection of the dates previously agreed upon. She <br />felt the $10,000 cash bond was necessary. She felt the time schedule was a necessary <br />ingredient in order for the seawalls to be completed by spring. She appreciated the <br />homeowners wanting to take over the responsibility but was concerned about their position <br />and ability to control the contractor. <br />Mr. Bruno stated the homeowners were forced into the situation and agreed with <br />Cangianelli that the terms the County presented were too demanding and too restrictive. <br />They have already contacted other contractors who would not agree to the terms. <br />Chairman Eggert pointed out that the time frame approved by the Board for <br />completion of the seawalls for the properties to the south were different from what she was <br />reading in the letter. <br />Mr. Bruno quoted from a letter concerning a meeting the property owners had with <br />Public Works Director James Davis on May 3 0'. The letter estimated a total of three months <br />continuous construction. <br />Chairman Eggert did not have a problem if the construction "slipped" one month, but <br />45 <br />NOVEMBER 18, 1997 <br />BOCK 103 P4E 487 <br />
The URL can be used to link to this page
Your browser does not support the video tag.