Laserfiche WebLink
Commissioner Ginn stated that she had also done some checking and found no <br />lawsuits or complaints. Another of their projects was the City of Juno Beach Governmental <br />Complex and they just fell in love with the design. She was told they even have windows <br />that open. <br />THE CHAIRMAN CALLED THE QUESTION and <br />the Motion passed unanimously. <br />H.H. CENTRAL REGION WASTEWATER TREATMENT <br />FACILITY - CONSTRUCTION OF NON -SPEC <br />EFFLUENT LINE - U.S. FILTER - DRIVEWAYS, INC. <br />The Board reviewed a Memorandum of April 13, 1998: <br />DATE: APRIL 13, 1998 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />i <br />FROM: DONALD R. HUBBS, P.E. <br />DIRECTOR OF UTILITY SERVICES <br />PREPARED AND ROBERT O. WISEMEN, P.E. _ q ""' <br />STAFFED BY: ENVIRONMENTAL ENGINEER <br />SUBJECT: CENTRAL REGION WASTEWATER TREATMENT FACILITY <br />CONSTRUCTION OF NON -SPEC EFFLUENT LINE <br />LABOR CONTRACT No. 4007, AUTHORIZATION No. 51 <br />INDIAN RIVER COUNTY PROJECT #US -95 -23 -DC <br />BACKGROUND <br />On July 8, 1997 the Board of County Commissioners approved an in-house design and <br />permit for the non -spec effluent line at Bent Pine. The County is presently advertising for <br />bids for the expansion of the Central Region Wastewater Treatment Facility from 1.0 to <br />2.0 MGD capacity. The bid opening for the expansion project is scheduled for the end of <br />this month. The expansion construction utilizes the percolation pond area that is presently <br />being used for disposal of the non -spec eluent water from the existing treatment facility <br />(See attached graphic). Therefore, prior to beginning the construction, a non -spec effluent <br />line should be built to replace this percolation pond. Staff is ready to construct this non - <br />spec eluent line to prepare for the commencement of this expansion projea <br />ANALYSIS <br />The construction material will be supplied directly by US Filter, the County's annual <br />material contract supplier (Bid No. 6010). The total cost of material for this project is <br />$35,939.47. The delivery time for the valve and electronic actuator motor driver is 6 to 8 <br />weeks. Staff is proposing to utilize the labor contract to construct this line. Driveways <br />Inc., the County's labor contractor has submitted the proposed Work Authorization, No. <br />51 in the amount of $9,310.70 to construct this non -spec effluent line. <br />The Board of County Commissioners has approved the cost for this portion of the project <br />in the amount of $50,000.00 which includes the survey, engineering and permit fees (See <br />the attached agenda item and minutes). <br />APRIL 21, 1998 <br />