Laserfiche WebLink
The site is bounded on the east by US L Classified as an urban principal arterial roadway on the <br />future roadway thoroughfare plan map, this segment of US 1 is a four lane road with approximately <br />120 feet of public road right-of-way. Currently, there are no plans to expand this portion of US 1. <br />The site is bounded on the south by 53'd Street. Classified as an urban principal arterial roadway on <br />the future roadway thoroughfare plan map, this segment of 53rd Street is a two lane unpaved road <br />with approximately 90 feet of public road right-of-way. Currently, 53`d Street is programmed for <br />paving and expansion to four lanes by 2005. <br />The site is bounded on the west by Old Dixie Highway. Classified as a collector roadway on the <br />future roadway thoroughfare plan map, this segment of Old Dixie Highway is a two lane road with <br />approximately 66 feet of public road right-of-way. Currently, there are no plans to expand this <br />portion of Old Dixie Highway. <br />There are some similarities and some differences between the existing IL zoning district and the <br />proposed CG district. The CG district is intended to provide for the small and large scale retail <br />needs of the county. The CG district is also intended to serve highway oriented retail needs. The <br />IL district is intended to provide for limited manufacturing and industrial uses and for employment <br />centers. The differences between the districts are best illustrated by their purpose statements. These <br />purpose statements are as follows: <br />• CG, General Commercial District. The CG, General Commercial, district is intended to <br />provide areas for the development of general retail sales and selected service activities. The <br />CG district is not intended to provide for heavy commercial activities, such as commercial <br />service uses, heavy repair services nor industrial uses. <br />• IL, Light Industrial District. The IL, Light Industrial, district is intended .to provide <br />opportunities for limited manufacturing and industrial uses and to promote the establishment <br />of employment centers which are accessible to urban services and facilities, the area labor <br />force, and local industrial and business markets while minimizing the potential for any <br />adverse impacts upon nearby properties. <br />In this section, an analysis of the reasonableness of the application will be presented. The analysis <br />will include a description of: ' <br />• concurrency of public facilities; <br />• compatibility with the surrounding area; <br />• consistency with the comprehensive plan; and <br />• potential impact on environmental quality. <br />This site is located within the county Urban Service Area, an area deemed suited for urban scale <br />development. The comprehensive plan establishes standards for. Transportation, Potable Water, <br />Wastewater, Solid Waste, Drainage, and Recreation. The adequate provision of these services is <br />necessary to ensure the continued quality of life enjoyed by the community. The comprehensive <br />plan also requires that new development be reviewed to ensure that the minimum acceptable <br />standards for these services and facilities are maintained. <br />Policy 3.2 of the Future Land Use Element states that no development shall be approved unless it <br />is consistent with the concurrency management system component of the Capital Improvements <br />Element. For rezoning requests, conditional concurrency review is required. <br />Conditional concurrency review examines the available capacity of each facility with respect to a <br />proposed project. Since rezoning requests are not projects, county regulations call -for the <br />concurrency review to be based upon the most intense use of the subject property based upon the <br />requested zoning district. For commercial rezoning requests, the most intense use (according to the <br />county's land development regulations) is retail commercial with 10,000 square feet of gross floor <br />area per acre of land proposed for rezoning. The site information used for the concurrency analysis <br />is as follows: <br />JUNE 169 1998 <br />-17-boC� <br />K i0b, <br />