My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/16/1998
CBCC
>
Meetings
>
1990's
>
1998
>
6/16/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:57 PM
Creation date
6/17/2015 11:06:10 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/16/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C: <br />• <br />TO: James Chandler <br />County Administrator <br />THROUGH: James W. Davis, P.E. <br />Public Works Director <br />Terry B. Thompson, P.g. <br />Capital Projects Man agert <br />FROM: G. Sean McGuire, P.E. <br />Project Engineer <br />SUBJECT: Award of Bid $8057 - Frontage Road at NE Corner of <br />Indian River Boulevard and Royal Palm Boulevard <br />DATE: June 9, 1998 <br />Bids were received May 27, 1998 for construction of a frontage road <br />on the NE corner of Indian River Boulevard and Royal Palm <br />Boulevard, a right turn lane for southbound traffic on Indian River <br />Boulevard onto westbound Royal Palm Boulevard and modification to <br />the median on Indian River Boulevard north of Royal Palm Boulevard. <br />The construction estimate for the project was $128,263.35 at the <br />time that the project was bid. One bid was received from Ranger <br />Construction for $176,073.65. Since the Florida Department of <br />Transportation is providing $150,000.00 to pay for this project, <br />staff has .met with Ranger Construction, to determine if the cost <br />could be reduced. The following changes are proposed: <br />Bid Description Reductions Additions Cost <br />RAvininn <br />liem <br />142-70 <br />Modify specification <br />($10,000.00) <br />($ 10,000.00) <br />for Sand FII (Select) <br />160-4 <br />Add 1,075 SY of <br />$ 4,891.25 <br />$ 4,891.25 <br />Type B Stabilization <br />(12') @ 4.55/SY <br />250-3 <br />Delete 424 CY of <br />($19,440.40) <br />($ 19,440.40) <br />Shell Material <br />(Coquina Sub -base) <br />250-3 <br />Add 803 SY of Shell <br />$ 7,708.80 <br />$ 7,708.80 <br />Material (8" Coquina <br />Base) 0- 9.60/SY <br />250-3 <br />Add 369 SY of Shell <br />$ 5,535.00 <br />$ 5,535.00 <br />Material (14" <br />Coquina Base) <br />15.00/SY <br />250-3 <br />Add 125 SY of Shell <br />$ 750.00 <br />$ 750.00 <br />Material (4" Coquina <br />Base) @ 8.00/SY <br />285-707 <br />Delete 803 SY of <br />($11,482.90) <br />($ 11,482.90) <br />Base Group 7.5" <br />ABC -3 Q 14.30/SY <br />285-714 <br />Delete 369 SY of <br />($ 8,257.85) <br />($ 8,257.85) <br />Base Group 14 8.5" <br />ABC -3 (83 22.65/SY <br />520-1-8 <br />Delete 560 LF of 4" <br />($ 1,288.00) <br />($ 1,288.00) <br />concrete pad under <br />Concrete Curb, Type <br />A @ 2.30/1-F <br />ne <br />ray �4 GCA fin\ <br />JUNE 169 1998 <br />-27- <br />Base Bid $176,073.65 <br />Revised Contract $144,489.55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.