Laserfiche WebLink
r <br />Box 106 ma 405 <br />building evaluation report. The Vero Mall was built in 1978 and closed in early <br />1998. It is SCP's opinion that it will be very costly to convert this facility into the <br />administrative center and if converted, the final result will not be the quality <br />obtainable with new construction. We also believe the finished product will <br />always look like a converted Mall rather than a well designed administrative <br />center. <br />A. To design and build a new facility of approximately 170,000 GFS the <br />construction costs, we estimate, to be as follows: <br />(We assumed a 3-storybuilding) <br />1. <br />Site Work <br />$ 750,000.00 <br />2. <br />Structure <br />$ 3,308,800.00 <br />3. <br />Exterior Walls/Windows/Doors <br />$ 1,026,000.00 <br />4. <br />Roof <br />$ 190;000.00 <br />5. <br />Interior Finishes <br />$ 5,100,000.00 <br />6. <br />HVAC <br />$ 2,380,000.00 <br />7. <br />Plumbing/Fire Protection <br />S 1,670,000.00 <br />8. <br />Electrical/Security <br />$ 3,200,000.00 <br />Interior Finishes <br />Sub Total <br />$17,624,800-00 <br />9. <br />Contingency @ 10% <br />$ 1,762,480.00 <br />2,380,000.00 <br />Sub Total <br />$19,387,280-00 <br />10. Purchasing/Warehouse Bldg. <br />@ $60.00/SF (35,000 SF) $ 2,100,000.00 <br />Total $23-487.282M <br />0.00 <br />B. To renovate the existing 170,000 GSF Vero Mall for conversion to the <br />Countv Administrative Facility we estimate the costs to be: <br />0. <br />Demolition costs for existing Interior Const. <br />$ <br />1,360,000.00 <br />1. <br />Site Work <br />$ <br />750,00.00 <br />2. <br />Structure (Hurricane Bracing) <br />$ <br />350,000.00 <br />3. <br />Exterior walls (openings for windows) <br />$ <br />800,000.00 <br />4. <br />Roof 0 70,000 GSF) + patching holes <br />$ <br />425,000.00 <br />5. <br />Interior Finishes <br />$ <br />5,100,000.00 <br />6. <br />HVAC <br />$ <br />2,380,000.00 <br />7. <br />Plumbing/Fire Protection <br />$ <br />1,600,000.00 <br />8. <br />Electrical/Security <br />$ <br />3,060.000.00 <br />Sub Total <br />$15,825,000.00 <br />9. Contingency @ 12% <br />Sub Total <br />10. Purchasing/warehouse bldg. <br />@ 60.00/SF (35,000SF) <br />Total <br />$ 1,899,000.00 <br />$17,724.000.00 <br />$2,100,000.00 <br />$19.824.000.00 <br />The estimated cost per square for 170,000 GFS of new construction is <br />$19,387,280.00 or $114.04/SF. The estimated cost for renovating the Mall is <br />17,724,000.00 or $104.26/SF. <br />The price to renovate the Vero Mall is exclusive of purchase price for the Mall and <br />its acreage and the price for new construction is also exclusive of land costs. <br />In addition, the professional fees for renovation work usually run in the 9-11 % of <br />construction costs while the fees for new work are in the 6 to 7% range. This <br />difference (say 6.5% Vs 9.5%) or 3% is a substantial sum based on an estimated 18 <br />million of construction costs (± 540,000.00) <br />In conclusion, SCP does not recommend that the Vero Mall be converted into the <br />County Administrative Complex. <br />July 28, 1998 <br />32 <br />