My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/6/1998
CBCC
>
Meetings
>
1990's
>
1998
>
10/6/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:59 PM
Creation date
6/17/2015 11:21:25 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/06/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
previously approved amendments (Nos. 1 and 2) were for $7,300.00 and <br />$10,000.00, respectively, and included work for off-site, non -spec effluent <br />disposal and master eluent control implementation, and revisions to the bid <br />package and re -bidding services. (See attached copies of Amendments 1 and <br />2). Approval of Amendment No. 3 will raise the total engineering service cost to <br />$725,000.00, or 6.8 % based upon a $10,672,415.00 total construction cost. <br />In addition to the extended construction services from CDM, staff will be <br />returning to the Board to request utilization of the Utilities Department's <br />outside contract inspector (Mr. Richard Mink) to supplement the CDM part- <br />time inspection on this project. As with previous projects, we wish to utilize a <br />contract inspector in lieu of additional funding of services from CDM for full- <br />time inspection resulting in significant savings. <br />The staff of the Department of Utility Services recommends that the Board of <br />County Commissioners approve Amendment No. 3 with CDM as presented and <br />authorize the chairman of the Board of County Commissioners to execute <br />same. <br />ON MOTION by Commissioner Ginn, SECONDED <br />by Commissioner Adams, the Board, by a 3-0 vote <br />(Chairman Tippin and Commissioner Eggert being <br />absent), unanimously approved Amendment No. 3 <br />with Camp Dresser McKee and authorized the Vice <br />Chairman to execute same, as recommended by <br />AMENDMENT IS ON FILE IN THE OFFICE <br />OF THE CLERK TO THE BOARD <br />11.H.2. INDIAN RIVER CLUB REUSE MAIN - DEVELOPER'S <br />AGREEMENT - FINAL RECONCILIATION <br />The Board reviewed a Memorandum of September 25, 1998: <br />OCTOBER 69 1998 <br />-60- BOOK 107 PACE 284 <br />
The URL can be used to link to this page
Your browser does not support the video tag.