My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/27/1998
CBCC
>
Meetings
>
1990's
>
1998
>
10/27/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:10:59 PM
Creation date
6/17/2015 11:23:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/27/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANALYSIS• <br />1. Overall Size: 36.4 acres <br />2. Zoning Classification: A-1, Agricultural (up to 1 unit/5 acres) <br />3. Land Use Designation: AG -1, Agricultural (up to 1 unit/5 acres) <br />Note: The project is located outside of and immediately west of the existing Urban Service <br />Area. <br />4. Building Area: Phase I: 55,223 sq. & (multi-purpose worship center) <br />Phase 11: 28,734 sq. & (sanctuary) <br />Phase Ili: 29-625 aq, & (education facilities) <br />Total: 113,582 sq. & <br />5. Open Space: Required: 600/6 <br />Provided: 64% <br />6. Off -Street Parking. <br />Required: Phase I: 333 spaces <br />Provided: Phase I: 679 spaces (308 paved, 371 grassIstabilized) <br />Required: Phases I, II, & III: 666 spaces <br />Provided: Phases I, II, & III: 793 spaces (590 paved, 203 grass/stabilized) <br />Note: The applicant is proposing to use grassed stabilized parking for some of the required <br />spaces. This is allowed for infrequent uses (such as churches), Pursuant to section 954.08(4). <br />By approving the site plan, the Planning and Zoning Commission approved the use of this <br />grassed Parking• The applicant is Proposing to pave a significant number of spaces <br />constructed during Phase I (308 of 679) and pave additional spaces during Phases II and III <br />(590 paved spaces of 793). Some of the grass spaces provided in phase I will be paved <br />during Phases II and III. Spaces for the educational facility and the day care center are <br />required to be paved and will be paved when those uses are constructed. <br />7. Traffic: The applicant is proposing two driveways on 58th Avenue and two driveways on 12th <br />Street. These will be two-way driveways, and are compatible with the proposed 5r Avenue <br />widening project now underway. Both 12th Street driveways will be full access. The 58th <br />Avenue driveways, however, will be limited to right-inInght-out movements. During Phase <br />I, the northernmost 58* Avenue driveway and the easternmost 1216 Street driveway will be <br />constructed The second 12i6 Street driveway is not a required driveway and will be <br />constructed when desired by the applicant. The second, southernmost driveway on 5816 <br />Avenue may be constructed in the future as a joint driveway with the property to the south, <br />depending upon how the property to the south develops. Construction of that driveway is <br />not required. This potential, future driveway would be limited to right-in/right-out <br />movements (the same as the other 58th Avenue driveway), and would require future county <br />approval. <br />The proposed project driveways provide access to several passenger drop-off and on-site <br />Parking areas. All parking lot areas are interconnected and are conveniently located on <br />various sides of the proposed buildings. Trdff c engineering has reviewed and approved the <br />on-site traffic circulation system. <br />A traffic impact analysis has been submitted and approved by the traffic engineering <br />division. Based on the approved traffic impact analysis, a west -bound left -tum lane is <br />required for the project's easternmost 12th Street driveway. This improvement will need to <br />be constructed prior to the issuance of a C.O. for Phase I, unless a different timeframe is <br />approved by the Board of County Commissioners via a developer's agreement. <br />A draft developer's agreement has been worked out between the applicant and public works <br />staff that provides for dedication of additional 58th Avenue right-of-way, construction of <br />intersection improvements, treatment/storage of a certain amount of 5e Avenue stormwater <br />on the church site, payment of the county's share of maintenance for on-site stonawater <br />improvements, and certain financial reimbursements. That agreement will be considered by <br />the Board at a future date. <br />8. Stormwater Management' The stormwater management plan has been reviewed and <br />approved by the public works department. The applicant will need to obtain a Type "B" <br />Permit from public works prior to site plan release. The Type "B" permit is required because <br />the site is within the 100 year flood plain. The permit will ensure that all stormwater criteria, <br />including cut and fill balance criteria, are met. <br />OCTOBER 27, 1998 <br />-21- BOOK 10 7 PAGE 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.