My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/16/1999
CBCC
>
Meetings
>
1990's
>
1999
>
2/16/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:55 PM
Creation date
6/17/2015 12:21:23 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/16/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
south. The proposed design satisfies the interconnected parking requirement. Since the <br />interconnection "stub -out" and the common driveway will be bisected by a property line, an <br />easement for construction is necessary. Therefore, prior to release of the approved site plan, <br />the applicant shall execute and record in the public records, in a manner acceptable to the <br />county attorney's office, a reciprocal easement that allows for construction and access use <br />of the common driveway that is proposed. <br />The County Traffic Engineer has accepted the traffic impact analysis submitted with the site <br />plan application, and has determined that a right -tum deceleration lane for the proposed <br />U S Highway 1 driveway is required to mitigate anticipated project impacts. The Traffic <br />Engineer has also approved the proposed access point. internal traffic circulation plan, and <br />the interconnected parking design. The Traffic Engineer has no objection to approval of the <br />major site plan application, subject to conditions ensuring review and approval of final <br />design details for a right -tum deceleration lane for the site's U S Highway 1 driveway <br />connection, and construction of the deceleration lane prior to issuance of a certificate of <br />occupancy. <br />14. Dedications and Improvements: In order to satisfy minimum local road right-of-way <br />requirements along 42" d Street, the developer/owner is required to dedicate to the county <br />without compensation 5' of 42" d Street right-of-way. The 5' dedication area is depicted on <br />the site plan. The actual dedication is required prior to release of the site plan. <br />In the area of the site, the current U S Highway 1 right-of-way width is 120'. In order to <br />provide for the county Thoroughfare Plan's 160' ultimate right-of-way width for U S <br />Highway 1, 20' of additional right-of-way would eventually be needed from the site. The <br />Public Works Department, however, does not desire to purchase the additional right-of-way <br />from the property owner at this time. The applicant/developer has been advised that future <br />U S Highway 1 right-of-way acquisition from the site could result in non -conformities (e.g. <br />parking and landscaping). <br />Site street lighting and a 5' wide sidewalk along the site's U S Highway 1 and 42nd Street <br />frontages are required improvements, and are depicted on the site plan for construction. <br />15. Environmental Issues: <br />Uplands: The project is less than 5 acres; therefore, it is not subject to the native <br />upland set-aside provisions of LDR section 929.05. <br />Wetlands: The St. Johns River Water Management District has identified two low <br />quality, isolated wetlands totaling .39 acres on the site. Development of the site will <br />result in filling all .39 acres of the wetlands. Therefore, prior to release of the site <br />plan, the applicant/developer shall apply for and obtain a county wetlands resource <br />permit and mitigate the impact of the wetlands filling pursuant to the provisions of <br />LDR section 928.06. County environmental planning staff has no objection to <br />mitigation measures, subject to St Johns River Water Management District approval. <br />16. Concurrency: The applicant has chosen not to apply for an initial concurrency certificate at <br />this time and has executed and notarized a concurrency notice form. The notice states that <br />no building permit will be issued for all or any portion of the project unless and until a <br />concurrency certificate is issued for the project The notice will be recorded in the public <br />records in order to alert any subsequent purchasers of the project or portions of the project <br />about the status of the project's concurrency requirements. Therefore, concurrency is <br />satisfied in regard to site plan approval. <br />In conjunction with the conditions attached to the Planning and Zoning Commission's site plan <br />approval, there is no contention that the site plan application fails to satisfy applicable LDR site plan <br />and design standards. <br />USE AND ZONING CODE ISSUES <br />Based upon and consistent with the adopted Comprehensive Land Use Plan, the county's zoning <br />map places every property in the unincorporated area of the county into one or more zoning districts. <br />Also based upon and consistent with the adopted plan, the county�s zoning code (Chapter 911) sets <br />forth which uses are allowed in each district(s) and under what conditions (if any). Therefore, since <br />the subject site's CG zoning is consistent with its C/I (Commercial/Industrial) land use designation, <br />development of the subject property is considered to be consistent with the comprehensive plan if <br />it is consistent with the CG district regulations. <br />FEBRUARY 16, 1999 <br />-41- BOOK 108 FACE 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.