My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/4/1999
CBCC
>
Meetings
>
1990's
>
1999
>
5/4/1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:11:56 PM
Creation date
6/17/2015 12:34:50 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/04/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F, <br />• <br />BOOK iOj pg E <br />11.G.2. KINGS HIGHWAY (58TH AVENUE) IMPROVEMENTS - <br />CHANGE ORDER #3 - DICKERSON FLORIDA <br />The Board reviewed a Memorandum of April 27, 1999: <br />TO: James Chandler <br />County Administrator <br />THROUGH: James W. Davis, P.EqC, <br />Public Works Directo <br />Donald R. Hubbs, P.E. M �: �1��, ld � 14..hb' <br />Director of Utility ServicesV <br />FROM: Terry B. Thompson, P. <br />Capital Projects Manag <br />SUBJECT: Kings Highway (581' Avenue) Improvements <br />Change Order No. 3 <br />DATE: April 27, 1999 <br />The contractor for 51P Avenue, Dickerson Florida, Inc. has completed approximately 95% <br />of the underground drainage and utility work The attached Change Order No. 3 resolves <br />utility conflicts that have been encountered to date. A detailed summary of drainage <br />revisions is attached as back up to the Change Order. <br />Change Order No. 3 includes drainage increases in the amount of $99,152.32 and <br />drainage deducts in the amount of $86,251.50 for a net increase of $12,900.82. Utility <br />revisions include increases in the amount of $16,165.03 and deducts in the amount of <br />$10,752.00 for a net increase of $5,413.03. <br />Change Order No. 3 also contains a list of miscellaneous increases and decreases to <br />bring actual quantities up to date. Credits include $59,243.25 for geogrid that was not <br />required, $3,208.64 for back charging the Capital Projects Inspectors overtime, and <br />$1,020.00 for density tests that had to be redone. Increases include $26,428.05 for <br />construction of a gravity retaining wall in front of the substation north of the Main Relief <br />Canal, $2,128.00 for a variable message sign at SR 60, $911.20 net change for concrete <br />barrier wall increases and deducts, and $3,000.00 to raise the elevation of the berm at <br />Kingswood one foot <br />Dickerson's schedule was seriously impacted as a result of lengthy negotiations at the <br />beginning of this project with regard to select fill. The select fill problem was resolved with <br />the issuance of Change Order No. 2, but the contract time was not addressed. Dickerson <br />estimates that they were delayed in excess of 120 days. Their contract schedule indicated <br />this resulted in a schedule delay of 100 days. Dickerson believes that they can make up <br />for approximately 35 days and have therefore requested a 65 day extension. This moves <br />their contract completion date from September 19, 1999 to November 30, 1999. <br />Staff recommends approval of the attached Change Order No. 3 which reduces the <br />contract in the amount of (44,512.57). This subtracted from the current contract amount <br />of $6,189,457.70, results in a new contract amount of $6,184,945.13. <br />The division of funding for Change Order No. 3 is as follows: <br />Roadway Construction (-$17,423.35) <br />109-214-541-067.31 <br />Indian River County Utilities +$12,910.78 <br />472-000-169-321.00 <br />MAY 49 1999 <br />-54- <br />_I <br />
The URL can be used to link to this page
Your browser does not support the video tag.