Laserfiche WebLink
The project entry north of 5" Street SW will align with the proposed main entry road to the <br />south. The north area entrance road will branch out to provide access to the three_ Villages <br />located north of 51" Street SW. <br />A traffic impact analysis has been reviewed by Traffic Engineering. The review of that <br />analysis indicates that the following improvements are required to mitigate project traffic <br />impacts: <br />Westbound right -tum lane on 91 Street SW at the project's 9'" Street SW entrance <br />2. West bound left -tum lane on 51 Street SW at the project's 5'" Street SW entrance. <br />3. Eastbound left -turn lane on 51 Street SW at the project's 5' Street SW entrance. <br />4. Southbound left -tum lane on 581 Avenue (King's Hwy) at 5'" Street SW/58th <br />Avenue intersection. <br />5. Three lane bridge over the Lateral B Canal to connect 5' Street SW to 581 Avenue <br />intersection. <br />6. Paving 5' Street SW from 58' Avenue to 431 Avenue. <br />A southbound right -tum lane on 27" Avenue at its intersection with 8'" Street. <br />Note. This is the same list of required improvements identified for the previous development <br />proposal. <br />A developer's agreement will control the timing of these and other required improvements. This <br />developer's agreement will need to be approved by the Board of County Commissioners prior to the <br />issuance of a land development permit. <br />14. Utilities: <br />Connection to public water and wastewater services is mandatory. These utility provisions <br />have been approved by the Health Department and the County Utility Services Department. <br />The applicant will be extending both county water and sewer lines to the site pursuant to a <br />separate developer's agreement with the Department of Utility Services. The utilities <br />developer's agreement will need to be approved by the Board of County Commissioners <br />prior to the issuance of a land development permit. <br />15. Dedications and Improvements: <br />Sidewalks: A 5' public sidewalk is required to be constructed along the site's 9' <br />Street SW and 51" Street SW frontages (north side of each street frontage). The <br />sidewalks are shown on the conceptual plan and will need to be constructed in <br />conjunction with the appropriate development phase. <br />Paving of 5" Street SW.- 5'" Street SW must be paved from 431d Avenue to 581" <br />Avenue. The timing and any county contribution for such paving will be part of the <br />developer's agreement that will require Board of County Commissioners approval. <br />January 11, 2000 <br />37 <br />