Laserfiche WebLink
BOOK Ili FAQ E G - A <br />Bridge at Su Street SW and 5e Avenue: The applicant is responsible for constructing <br />the bridge over the Lateral B Canal. The developer's agreement will set the timing <br />and amount of any county contribution. <br />Emergency Access and Pedestrian Access: Emergency access and pedestrian access <br />points will be provided in Villages A and D and will provide emergency and <br />pedestrian access to Th Street SW. These connections have been conceptually <br />approved by Emergency Services and Public Works, and will be constructed in the <br />appropriate phases. The applicant will need to obtain approval of Emergency <br />Services and Public Works for detailed designs of the emergency access points. Said <br />details will be reviewed under the appropriate land development permit applications. <br />Proposed PD Waivers: The proposed waivers available through the PD process are <br />discussed in the PD zoning analysis section of this staff report. Please reference that <br />section for waivers proposed by the developer. <br />Pedestrian Circulation: The applicant has submitted an approvable internal <br />pedestrian circulation plan which provides for the emergency access points to <br />function as pedestrian accesses. The pedestrian plan consists of sidewalks on both <br />sides of all internal streets, a sidewalk along the west side of the main north/south <br />road and a path connecting the two cul-de-sacs in Village B. The sidewalks will be <br />constructed with the respective phases. Ultimately, the pedestrian system will <br />contain over 2.6 miles of perimeter paths and 1 mile of sidewalk along the main <br />roadway with additional sidewalks internal to the Villages. <br />Indian River Farms Water Control District Access Easement and Landscape <br />Easement: Along the project's western property line, the applicant is proposing to <br />grant the Indian River Farms Water Control District (IRFWCD) a 25 foot wide <br />access easement for maintenance of the north/south Lateral B Canal. This <br />maintenance easement is desirable, but is not consistent with the landscape buffers <br />shown on the proposed conceptual plan. Therefore, a 10' wide landscape easement <br />will need to be established along 581h Avenue south of P Street SW immediately east <br />of the 25' access easement to support the required Type "C" buffer plantings; north <br />of 5t6 Street SW, a 50' wide landscape easement will need to be established east of <br />the IRFWCD's 25' maintenance easement to support the recommended 50' wide <br />Type "B" buffer. Both easements will need to be established via the final plat. <br />Accessory Commercial. • The applicant is proposing a maximum build -out of 9,580 <br />sq. R of accessory commercial building area. This is allowed based on the criteria <br />of PD section 915:12. The proposed design meets the criteria, which are attached. <br />In staffs opinion, the location of the accessory commercial away from the project <br />perimeter, and in conjunction with the project clubhouse and main north/south road, <br />is acceptable. Current plans propose a typical retail building "rear end" facing <br />proposed project residences. To mitigate the negative impacts of this design, a <br />screening wall and intervening internal local road will be placed between the <br />building's "rear end" and the adjacent project residences. <br />Road Names: The applicant is requesting the use of named roads rather than <br />numbered roads which fit into the county's street number grid system. Staff has <br />denied this request, and the Planning and Zoning Commission has upheld the staffs <br />January 11, 2000 <br />38 <br />