My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/20/2000
CBCC
>
Meetings
>
2000's
>
2000
>
6/20/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2018 8:46:17 AM
Creation date
6/9/2015 1:19:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/20/2000
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />The Thoroughfare Plan depicts an unlabeled thoroughfare east of US #1 that lies <br />between 57'" Street and 65t° Street, and generally aligns with 61' Street, which exists <br />and is labeled as such on the plan west of US #1. The purpose of the unlabeled <br />thoroughfare segment east of US #1 is to provide adequate access to parcels located <br />between US #1 and the Indian River Lagoon. in an area lying between 57' Street and <br />651h Street. The proposed development consolidates many of these parcels and <br />provides adequate access. For the non -project parcels south of 63rd Street. the <br />applicant will improve 631 Street to provide access to these parcels. Thus, under the <br />proposed PD plan. 63`d Street will be improved and will serve as the unlabeled <br />Thoroughfare Plan road segment for the area east of US #1, lying between 57th Street <br />and 651h Street. In the opinion of planning and attorney's office staff, this proposal <br />is consistent with the Thoroughfare Plan (see attachment #4). <br />12. Traffic Circulation: The project's proposed primary accesses will be from 63`d Street and <br />either US #1 or 531d Street/Indian River Boulevard. The project will have 2 access <br />connections to 63rd Street. The western connection will serve the proposed 60 lot "Pod K", <br />and provide a secondary access to the overall project. The eastern connection will be the <br />project's primary 631d Street entrance and is integrated into the project's internal road system. <br />For the project's main southern entrance, the developer is proposing two alternative access <br />options. The first option is a connection to US #1 just north of the North Relief Canal; staff <br />views this as the most likely option. The second. and more speculative option is to extend <br />a private roadway south across the North Relief Canal and the Whisper Lakes golf course site <br />and connect that new roadway to 53'd Street at the intersection of 53'd Street and Indian River <br />Boulevard. Either option is acceptable to staff. Approval of the conceptual PD plan will <br />allow either option. <br />A traffic impact analysis MA) has been reviewed and approved by Traffic Engineering. The <br />TIA is based upon the US #1 connection and does not take into account the option of <br />extending a roadway to 53'd Street/Indian River Boulevard. If the connection to 53'd <br />Street/Indian River Boulevard is the option pursued by the applicant, a revised TIA will need <br />to be submitted with the preliminary PD plan. Under such circumstances, the applicant <br />would be required to construct the off-site improvements indicated as a result of the revised <br />TIA. The review of the submitted TIA based on the US #1 entrance design indicates the <br />following improvements are required to address anticipated project traffic impacts: <br />1. Southbound left -turn lane on US #1 at 631' Street, and <br />2. Northbound right -turn lane on US #1 at 631d Street, and <br />3. Northbound right -tum lane on US #1 at the project's southernmost entrance on US <br />#1, and <br />4. Eastbound right -tum lane on 63' Street at the project's primary 63'd Street entrance. <br />5. A westbound left -turn lane on 63rd Street at US #1. <br />A developer's agreement will be required to specify and control the timing of these required <br />improvements. This developer's agreement will be brought to the Board of County <br />Commissioners later in the project development process and will need to be approved by the <br />Board prior to the issuance of a land development permit for the project. <br />June 20, 2000 <br />Mie <br />BOOK .LIJ SAGE i <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.