Laserfiche WebLink
The site is within the Urban Service Area of the county. Potable water lines extend -to the site from <br />the South County Reverse Osmosis Plant. Although the site is within the service area of the South <br />Regional Wastewater Treatment Plant, collection lines do not currently extend to the site. <br />Transportation System <br />Access to the site is provide by 9`h Street, SW. Classified as a rural minor arterial roadway on the <br />future roadway thoroughfare plan map, this segment of 9'h Street, SW is a two lane road with 60 feet <br />of public road right-of-way. This segment of 9`h Street, SW is programmed for expansion to four <br />lanes and 130 feet of public road right-of-way by 2020. <br />In this section, an analysis of the reasonableness of the rezoning request will be presented. <br />Specifically, this section will include: <br />• an analysis of the request's impact on public facilities; <br />• an analysis of the request's consistency with the county's comprehensive plan; <br />• an analysis of the request's compatibility with the surrounding area; and <br />• an analysis of the request's potential impact on environmental quality. <br />This site is located within the county Urban Service Area, an area deemed suited for urban scale <br />development. The Comprehensive Plan establishes standards for. Transportation, Potable Water, <br />Wastewater, Solid Waste, Drainage and Recreation (Future Land Use Policy 3.1). The adequate <br />provision of these services is necessary to ensure the continued quality of life enjoyed by the <br />community. The Comprehensive Plan and Land Development Regulations (LDRs) require that new <br />development be reviewed to ensure that the minimum acceptable standards for these services and <br />facilities are maintained. <br />Policy 3.2 of the Future Land Use Element states that no development shall be approved unless it <br />is consistent with the concurrency management system component of the Capital Improvements <br />Element. For rezoning requests, conditional concurrency review is required. <br />Conditional concurrency review examines the available capacity of each facility with respect to a <br />proposed project. Since rezoning requests are not projects, county regulations call for the <br />concurrency review to be based upon the most intense use of the subject property based upon the <br />requested zoning. For residential rezoning requests, the most intense use (according to the County's <br />LDRs) is the maximum number of units that could be built on the site, given the size of the property <br />and the maximum density under the proposed zoning. The site information used for the concurrency <br />analysis is as follows: <br />1. Size of Area to be Rezoned: ±26.4 acres <br />2. Existing Zoning District: A-1, Agricultural District (up to 1 unit/5 acres) <br />3. Proposed Zoning District: RS -3, Single -Family Residential District (up to 3 <br />units/acre) <br />October 3, 2000 <br />71 <br />BIS 115 PG 309 <br />