My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/17/2000
CBCC
>
Meetings
>
2000's
>
2000
>
10/17/2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:14:20 PM
Creation date
6/16/2015 3:36:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/17/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br />5. Open Space: Required: 80% <br />Provided: 85.25% <br />Note: As provided for in the LDRs, project open space includes credit for lake area and <br />counts green open recreation areas, such as soccer and baseball fields, as open space. <br />6. Off -Street Parking: Required: 255 spaces <br />Provided: 547 spaces <br />Note: 128 spaces are paved, and 419 are grassed/stabilized. County LDRs allow up to <br />50% (127) of the required spaces and all of the overflow spaces to be <br />grassed/stabilized spaces. The applicant is proposing significant overflow parking <br />to accommodate parking for infrequent special events. <br />7. Traffic Circulation: The site will be accessed via a main entrance (full access driveway) on <br />CR 512. The driveway will be located approximately where the existing `old ranch" <br />driveway is located, but will be reconfigured to meet county entrance driveway standards. <br />The driveway will provide for all movements, and will provide outbound right and left -turn <br />lanes for exiting the site. <br />This entrance driveway will also provide access to the State Buffer Preserve as well as the <br />North County Park. It will be paved from CR 512 through the front half of the proposed park <br />area where the most intense park activity will occur (pools, lazy river, baseball fields). The <br />paved portion will provide -access to the main parking area located adjacent to the pools and <br />lazy river. An on-site east/west driveway will connect the main north/south driveway to <br />parking areas and to the adjacent Middle School site to the east. This inter -connection has <br />been approved by the School Board, and will provide secondary access for the park site. In <br />addition, this interconnection will provide access from the park site to a CR 512 traffic signal <br />at the Middle School's main entrance driveway. That signal can be used for the park's peak <br />traffic times during special events. <br />A traffic impact statement has been prepared and approved by the county Traffic Engineering <br />Division. The results of the statement indicate that no new off-site improvements are <br />required, and none are proposed. It should be noted that there is a county road project <br />approved to widen CR 512 to 4 lanes and provide a turn -lane at the park/Buffer Preserve <br />entrance. The CR 512 roadway widening project is separate from the park project and should <br />be under construction prior to completion of the Phase I park improvements. As stated <br />previously, these road improvements are not required for the park project. <br />October 17, 2000 <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.