Laserfiche WebLink
7/24/2015 <br /> Stakeholder Comments Received (cont.) <br /> Polymath Consulting (Bob Ulevich) <br /> The boundary of the SRID shown incorrectly excludes the portion to <br /> the north (approx. 1 mile downstream of CR512 Bridge) <br /> Desired Project Vicinity discounts overall value of regional area <br /> Evaluation only considers current SRID system configuration and not <br /> previously presented concepts <br /> Cons presented for a reservoir system (vs. an ASR system) should not <br /> be a primary deterrent. <br /> Use of IRFWCD water should be re-evaluated; costs of pump station(s) <br /> is significant undertaking <br /> Smith <br /> Stakeholder Comments Received (cont.) <br /> Polymath Consulting (cont.) <br /> Consider revisiting discussions with SJRWMD regarding regional <br /> attenuation system within the Lateral D basin <br /> Expand the evaluation (ex. soil survey) westward into Lateral D basin <br /> Close communications with local jurisdictions relative to use of ROWs <br /> is encouraged to avoid conflicts <br /> FEMA/FIRM dispute may have significant financial consequence to the <br /> SRID and any reservoir siting <br /> Request that a more regional look be taken prior to identifying a <br /> desired location. <br /> Smith <br /> 17.44,- 13 <br />