Laserfiche WebLink
7/24/2015 <br /> Stakeholder Comments Received (cont.) <br /> SRID District Engineer (CAI) <br /> The reduction of the flow of stormwater runoff from the District may <br /> result in environmental benefits to the IR Lagoon. Therefore the <br /> construction of the reservoir is mutually beneficial to both the District <br /> and the County in meeting future water demands and pollution <br /> reduction goals. <br /> Infrastructure placed in the SRID ROW's must not hinder existing or <br /> future drainage capabilities, maintenance activities or other projects. <br /> Maintenance of the reservoir and related components will be the <br /> responsibility of the County. <br /> Smith <br /> Stakeholder Comments Received (cont.) <br /> SRID District Engineer (cont.) <br /> Discharges from the reservoir back into the SRID drainage system <br /> must not occur during or immediately after a storm event when the <br /> SRID system is recovering from the storm. <br /> A permit for the construction of the improvements must be approved <br /> by the SRID Board of Supervisors before issuance. <br /> Smith <br /> 14(-.A•14 <br />