My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/07/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
07/07/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 1:39:06 PM
Creation date
9/2/2015 1:29:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/07/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7/24/2015 <br /> Stakeholder Comments Received (cont.) <br /> SRID District Engineer (CAI) <br /> The reduction of the flow of stormwater runoff from the District may <br /> result in environmental benefits to the IR Lagoon. Therefore the <br /> construction of the reservoir is mutually beneficial to both the District <br /> and the County in meeting future water demands and pollution <br /> reduction goals. <br /> Infrastructure placed in the SRID ROW's must not hinder existing or <br /> future drainage capabilities, maintenance activities or other projects. <br /> Maintenance of the reservoir and related components will be the <br /> responsibility of the County. <br /> Smith <br /> Stakeholder Comments Received (cont.) <br /> SRID District Engineer (cont.) <br /> Discharges from the reservoir back into the SRID drainage system <br /> must not occur during or immediately after a storm event when the <br /> SRID system is recovering from the storm. <br /> A permit for the construction of the improvements must be approved <br /> by the SRID Board of Supervisors before issuance. <br /> Smith <br /> 14(-.A•14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.