Laserfiche WebLink
PRELIMINARY ASSESSMENT SUMMARY <br />DIXIE HEIGHTS, A PORTION OF DLk7E GARDENS, AND THE PINEY OAKS SUBDIVISION <br />WATER EXPANSION <br />INDIANRIVER COUNTYPROJECTNO. UW -93 -34 -DS <br />Estimated Total Construction Cost w/ Master Plan Line <br />$1,618,450.00 <br />Non -Assessed Portion (12" Master Plan Line) <br />$461,400.00 <br />Estimated Construction Cost <br />Assessed Portion <br />Master Plan Line <br />10% Contingency <br />$1,157,050.00 <br />$461,400.00 <br />Estimated Engineering Cost <br />$115,705.00 <br />$46,140.00 <br />Estimated Survey Cost <br />$50,912.00 <br />$35,532.00 <br />Estimated Permitting <br />$8,900.00 <br />$5,900.00 <br />Estimated Bidding and Services During Construction <br />$6,334.00 <br />$25,606.00 <br />$2,538.00 <br />$10,302.00 <br />Administrative Expenses <br />$6,364.00 <br />$5,076.00 <br />TOTAL ESTIMATED COST to be ASSESSED <br />$1,370,871.00 <br />TOTAL FOR PRELIMINARY BUDGET PURPOSES <br />$1,380,000.00 <br />$570,000.00 <br />Estimated Square Footage to be Assessed <br />Estimated Cost per Square Foot <br />Estimated Cost per Square Foot (rounded) <br />TOTAL PROJECT COST <br />NOTES: • Special permit design and coordination with Indian River Farms Water Control Distirct <br />5,293,258 <br />$0.2607090000 <br />$0.260709 <br />$1,950,000.00 <br />EXHIBIT 3 <br />