Laserfiche WebLink
and skirting of the structure(s) at $13,820. In addition to these charges there would be the normal utility <br />and transportation impact fees that would have to be paid for new structures. This would be the only cost <br />if located at the Road and Bridge site with the continued use of the existing warehouse. Or, additional <br />structures could be obtained to provide storage at a different location with the office facilities such as <br />behind or adjacent to the Purchasing Warehouse. <br />Advantages: <br />Disadvantages: <br />Close proximity to current administration facilities; cost appears to be affordable <br />at $5.94 per square foot ($37,251 annually); three year lease available; could <br />relocate into a new facility if one is built in the near future; delivery can be made <br />to accommodate the Supervisor's time constraint subject obtaining a timely site <br />plan and building permit approval; accessible to county fiber optic network. <br />If located at the Road Bridge complex, it may not be desirable for public access <br />such as voter registration. It could be reduced in scope and provided just for the <br />Supervisors technicians but that could present a problem during elections <br />especially with recounts, the canvassing board etc. Another alternative is to <br />locate the structure along with a storage facility some where in the vicinity of the <br />Purchasing Warehouse. That would require additional space and cost to <br />accommodate the storage of the voting machines. The cost of the additional <br />space would be estimated to be about 50% more resulting in a cost estimated to <br />be at least $55,875 with an additional $13,820 in set up costs. A major issue is <br />getting all the required regulatory approvals such as site planning approvals and <br />permits in advance of the units to have everything in place by the time needed. <br />The 43rd Avenue Trade Center is another viable alternative located within the boundary of the Vero <br />Beach Airport fronting on 43rd Avenue. This is a steel type structure that is about to be built and can be <br />available in the late April or early May time period. The initial quote was for 6,400 square feet but 8,000 <br />square feet can be provided. The cost per square foot is $5.50 per square foot plus $L25 per square foot <br />for common area maintenance resulting in a an over all cost of $6.75 per square foot. This is an annual <br />cost of $54,000 per year. There is a build out allowance of $37,500. It is estimated that it would cost <br />about $150,000 netting out at $112,500 after the allowance is deducted. <br />Advantages: <br />This project has already received regulatory approvals and is about to be built <br />which provides the owner the opportunity to make the propose facility available <br />as early as sometime in May. The annual cost of this proposed facility is <br />extremely affordable and would be new. It is offered with a three-year lease with <br />options which makes it easier to relocate from if a new County facility is <br />constructed in the near future. The site has relative easy access and is on a <br />collector type roadway; accessible to county fiber optic network. It is located <br />within the County Seat. <br />Disadvantages: While located within the County Seat, it is located near the approach of a runway <br />at the Vero Beach Airport. This may be noisier than other locations and certainly <br />would not be recommended as a long-term use for the type of location that would <br />be needed for the Supervisor of Elections. The location may be somewhat <br />difficult in describing for directions on behalf of the general public. <br />The decision as to where the Supervisor is ultimately relocated is both an economic decision and <br />one as to the degree of permanency. If there is no concern about relocating the Elections office <br />into a new county administration building, then a more permanent facility either owned or leased <br />may be appropriate subject to cost and proper location. <br />RECOMMENDATION: <br />As of the writing of this transmittal memo, staff is offering no recommendation, but due to the <br />sort time frame identified by the Supervisor of Elections, staff is seeking comment and direction <br />in order to foimulate a final recommendation for the Board. <br />March 5, 2002 <br />52 <br />BK 1 2 ? P3 553 <br />