My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/24/2001
CBCC
>
Meetings
>
2000's
>
2001
>
7/24/2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 9:32:55 AM
Creation date
9/25/2015 4:25:14 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Migration
Meeting Date
07/24/2001
Archived Roll/Disk#
2279
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 • <br />1 LG.5. VERO LAKE ESTATES STORMWATER RETROFITTING <br />PROJECT - PHASE I - FLORIDA DEPARTMENT OF <br />ENVIRONMENTAL PROTECTION AGREEMENT - DEP CONTRACT <br />NO. WM803 <br />The Board reviewed a Memorandum of July 16, 2001: <br />TO: James Chandler, County Administrator <br />THROUGH: James W. Davis, P.E., Public Works DirectoL. <br />FROM: W. Keith McCully, P.E., Esq., Stormwater Engineer <br />SUBJECT: Vero Lake Estates Stormwater Improvements, Phase I <br />DATE: July 16, 2001 <br />DESCRIPTION AND CONDITIONS <br />Attached is a proposed Contract (DEP CONTRACT NO. WM803 - FLORIDA DEPARTMENT OF <br />ENVIRONMENTAL PROTECTION AGREEMENT FOR THE VERO LAKE ESTATES <br />STORMWATER RETROFITTING PROJECT — PHASE I) between Indian River County and the <br />Florida Department of Environmental Protection (DEP), for a Section 319(h) Non -Point Source <br />Program Management Grant for the referenced project. The County requested certain minor <br />revisions to the draft contract prepared by DEP and that agency has incorporated our revisions <br />into this final draft. <br />For satisfactory performance by the County, DEP agrees to compensate the County on a cost <br />reimbursement basis, an amount not to exceed $400,000. The County will provide a non-federal <br />match through in-kind services and through other non-federal funding sources. The total estimated <br />project cost is $1,227,180. Construction and post -construction costs are estimated to be $1,168,000. <br />RECOMMENDATIONS <br />Staff recommends the Board of County Commissioners authorize the Chairman to execute the <br />attached Contract. <br />ATTACHMENTS <br />1. DEP CONTRACT NO. WM803 - FLORIDA DEPARTMENT OF ENVIRONMENTAL <br />PROTECTION AGREEMENT FOR THE VERO LAKE ESTATES STORMWATER <br />RETROFITTING PROJECT — PHASE I, and associated attachments --- (2) copies. <br />July 24, 2001 <br />45 <br />Dn <br />K i 1 t U <br />
The URL can be used to link to this page
Your browser does not support the video tag.