Laserfiche WebLink
• <br />• <br />• <br />Indian River County 1 Impact Fee Update Study <br />Design <br />County Roadways <br />The design cost factor for county roads was estimated as a percentage of the construction <br />cost per lane mile. This factor was determined through a•. review of the design -to - <br />construction cost ratios for county road unit costs in previously completed impact fee <br />studies throughout Florida. For county roadways, the design factors ranged from 6 percent <br />to 14 percent, with a weighted average of 10 percent. For purposes of this update study, <br />the design cost for county roads was calculated at 10 percent of the construction cost per <br />lane mile (see Table C-10 for additional information) <br />aa. <br />State Roadways <br />Design Cost Adjustment — County Roads <br />Road TypeDesign <br />Design Cost per <br />Lane Mile' <br />Section Design <br />Distribution(�1 <br />Weighted <br />Cost per <br />Lane Mile �31 <br />Urban Design <br />$180,000 <br />NS, 34% <br />$61,000 <br />Rural Design <br />$149,000 <br />_ ,66% <br />$98,000 <br />Weighted Average Design Cost per Lane Mile <br />$159,000 <br />1) Design cost*is>estimated at 10% ofconstructio o tkbased on recent TIF studies in <br />Table Cd(Item a)5 r <br />(2) SourceAppendix C, TableC-17 (Itemsnd' <br />>czad) <br />(3) Design cost 'per lane m le (Item 1) mule plied by the associated section design <br />weight (Ite) for eaeh*design type andded together. <br />The designcost factor for state roads was estimated as a percentage of the construction <br />_:.. <br />t <br />cost per lane;mile. This factor was determined through a review of the design -to - <br />construction costratios for state road unit costs in previously completed impact fee studies <br />throughout Florida. For stateroadways, the design factors ranged from 10 percent to 14 <br />percent, with a weightedaverage of 11 percent. For purposes of this update study, the <br />design cost for state roads was calculated at 11 percent of the construction cost per lane <br />mile. See Table C-10 for additional information. <br />Tindale -Oliver & Associates, Inc. Indian River County <br />January 2014 C-2 Impact Fee Update Study <br />