My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-105
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 2:22:17 PM
Creation date
9/30/2015 7:31:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2004
Control Number
2004-105
Agenda Item Number
11.I.5
Entity Name
Sitewerks Inc.
Subject
Contract and Specifications Pelican Island National Wildlife Refuge
Area
Pelican Island
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3758
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0386-Technical Specifications <br /> 3 . Although installation of a temporary irrigation system is not required, <br /> Contractor is responsible for watering of planted material for establishment <br /> and survival through the guarantee period, through a temporary irrigation <br /> system or other means of his choice . If Contractor chooses to install an <br /> ' irrigation system, he must remove it from the site before the end of the <br /> guarantee period. Such irrigation system must be buried at crossings with <br /> service roads . Service roads include the proposed service road, the future loop <br /> ' road, and the western boundary of the project site . <br /> 4 . Refer to Part 1 , Paragraph 5D of this technical specification for Contractor ' s <br /> ' maintenance responsibilities during the guarantee period. <br /> B . CLEANING <br /> 1 . The Contractor shall at all times keep the premises (grounds and pavements) <br /> free from accumulations of waste material or rubbish caused by his employees <br /> ' or work. <br /> 0386-Technical Specifications <br /> F :\Engineering\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386-Technical <br /> Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.