Laserfiche WebLink
0386-Technical Specifications <br /> 3 . Although installation of a temporary irrigation system is not required, <br /> Contractor is responsible for watering of planted material for establishment <br /> and survival through the guarantee period, through a temporary irrigation <br /> system or other means of his choice . If Contractor chooses to install an <br /> ' irrigation system, he must remove it from the site before the end of the <br /> guarantee period. Such irrigation system must be buried at crossings with <br /> service roads . Service roads include the proposed service road, the future loop <br /> ' road, and the western boundary of the project site . <br /> 4 . Refer to Part 1 , Paragraph 5D of this technical specification for Contractor ' s <br /> ' maintenance responsibilities during the guarantee period. <br /> B . CLEANING <br /> 1 . The Contractor shall at all times keep the premises (grounds and pavements) <br /> free from accumulations of waste material or rubbish caused by his employees <br /> ' or work. <br /> 0386-Technical Specifications <br /> F :\Engineering\Capital Projects\0386-Pelican Island Upland Restoration\0386-Pelican Island -Contract Docs\0386-Technical <br /> Specifications.doc <br />