My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-097
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 1:48:25 PM
Creation date
9/30/2015 6:28:06 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
04/22/2003
Control Number
2003-097
Agenda Item Number
7.O.
Entity Name
Treasure Coast Contracting
Subject
Westside Subdivision Water Assessment Project
Project Number
UCP 2177
Bid Number
5049
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
3220
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . 04 . PAYMENT <br /> Payment will be made at the respective contract unit for each item shown in the <br /> Agreement , installed and accepted , which price and payment shall constitute full <br /> compensation for furnishing all materials and performing all work in connection <br /> therewith and incidental thereto . No separate payment will be made for the <br /> preparation of record drawings . Engineer shall determine the quantity of each <br /> item used . <br /> 1 . 05. RESTORATION OF DAMAGED SURFACES , STRUCTURES AND PROPERTY <br /> Where pavement, trees , shrubbery, fences , or other property or surface <br /> structures not designated as pay items have been damaged , removed , or <br /> disturbed by the Contractor, whether deliberately or through failure to carry out <br /> the requirements of the Contract Documents , state laws , municipal ordinances , <br /> or the specific direction of the Engineer, or through failure to employ usual and <br /> reasonable safeguards , such property and surface structures shall be replaced or <br /> repaired at the expense of the Contractor to a condition equal to that before work <br /> began within a time frame approved by the Engineer. <br /> END OF SECTION <br /> 01025-4 <br /> F:\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\West Side Subdivision - UCP#2177\Bid <br /> docs\specs\01025 Measurement and Payment. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.