Laserfiche WebLink
1 . 04 . PAYMENT <br /> Payment will be made at the respective contract unit for each item shown in the <br /> Agreement , installed and accepted , which price and payment shall constitute full <br /> compensation for furnishing all materials and performing all work in connection <br /> therewith and incidental thereto . No separate payment will be made for the <br /> preparation of record drawings . Engineer shall determine the quantity of each <br /> item used . <br /> 1 . 05. RESTORATION OF DAMAGED SURFACES , STRUCTURES AND PROPERTY <br /> Where pavement, trees , shrubbery, fences , or other property or surface <br /> structures not designated as pay items have been damaged , removed , or <br /> disturbed by the Contractor, whether deliberately or through failure to carry out <br /> the requirements of the Contract Documents , state laws , municipal ordinances , <br /> or the specific direction of the Engineer, or through failure to employ usual and <br /> reasonable safeguards , such property and surface structures shall be replaced or <br /> repaired at the expense of the Contractor to a condition equal to that before work <br /> began within a time frame approved by the Engineer. <br /> END OF SECTION <br /> 01025-4 <br /> F:\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\West Side Subdivision - UCP#2177\Bid <br /> docs\specs\01025 Measurement and Payment. doc <br />