My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-042
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2016 10:51:15 AM
Creation date
9/30/2015 9:30:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/07/2006
Control Number
2006-042
Agenda Item Number
11.I.3.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Amendement No. 2-widening -intersection improvements
Area
66th. Avenue/CR 510
Supplemental fields
SmeadsoftID
5445
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County, Amendment No. 2 <br /> 66`h Avenue/ County Road 510 Roadway <br /> Widening <br /> Approximately 1 , 500 linear-feet of improvements . <br /> • 63 `d Court - Proposed paved apron on south approach with no median <br /> opening. <br /> • 63 `d Avenue — Design three lane rural roadway section to accommodate <br /> northbound and southbound left turn lanes . Proposed three lane section will <br /> be designed utilizing a dedicated right turn deceleration lane north and south <br /> bound . Approximately 900 linear-feet of improvements . <br /> • 62nd Avenue - Proposed paved apron on south approach with no median <br /> opening. <br /> • 6151 Drive - Proposed paved apron on north approach with no median <br /> opening. <br /> The total length of expanded improvements on CR 510 is 6,530 linear feet or 1 .25 <br /> miles with an additional 2,400 linear feet or 0.45 miles of bisecting side street <br /> improvements for a total length of 8,930 linear feet or 1 .70 miles . <br /> 66`h Avenue Widening <br /> The COUNTY desires to improve 66`h Avenue to a four lane divided urban roadway <br /> constructed within a 160 feet right-of-way. The improvement limits will be designed <br /> between 1 ,250 feet north of 57`h Street to 77th Street. In conjunction with <br /> improvements to 66`h Avenue, the following improvements are proposed to the <br /> bisecting side streets : <br /> • 61 " Street - Design three lane urban roadway section to accommodate <br /> eastbound and westbound left turn lanes. Replace existing bridge (Bridge No . <br /> 884038) with three lane structure on east leg. Approximately 2,640 linear-feet <br /> of improvement. <br /> • 65` ' Street - Design three lane urban roadway section to accommodate <br /> eastbound and westbound left turn lanes . Replace existing bridge (Bridge No. <br /> 880049) with three lane structure on east leg. Approximately 2,640 linear-feet <br /> of improvement. <br /> • 691h Street - Design three lane urban roadway section to accommodate <br /> eastbound and westbound left tum lanes. Replace existing bridge (Bridge No . <br /> 884039) with three lane structure on east leg. Intersection improvements shall <br /> include mast-arm signalization components. Approximately 2 ,640 linear- feet <br /> of improvement. <br /> • 73 `d Street - Proposed paved apron on west approach with median opening. <br /> • 77'h Street - Proposed paved apron on west approach with median opening. <br /> The total length of improvements on 66`h Avenue is 11 , 880 linear feet or 2. 25 miles <br /> with an additional 7 ,920 linear feet or 1 . 5 miles of bisecting side street improvements <br /> for a total length of 19, 800 linear feet or 3 . 75 miles. <br /> " SECTION III — SCOPE OF SERVICES " is being modified to incorporate the following : <br /> B . Design Survey <br /> Page 2 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.