My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-351
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2016 1:18:27 PM
Creation date
9/30/2015 11:22:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Third Amendment
Approved Date
10/16/2007
Control Number
2007-351
Agenda Item Number
7.G.
Entity Name
McMahon Associates,Inc.
Subject
Amendment No.3 Intersection Improvements
Area
CR-510 and US Highway 1
Supplemental fields
SmeadsoftID
6645
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The estimated pond sites are located as follows : <br /> • Pond 1 is for the onsite drainage of CR-510 west of the 59'" Avenue, located at the CR-510 low <br /> point, at Station 298+80, and the north end of IRFWCD Lateral G Canal for the outfall. <br /> • Pond 2, located on the Fender and Graves Brothers property, is for the onsite drainage of CR-510 <br /> east of the high point, at approximately Station 314+00 to the US- 1 intersection. <br /> • Pond 3, located on the Red Stick Golf Club property, is for the onsite drainage of 58� Avenue. <br /> • Pond 4, also located on the Red Stick Golf Club property, is for both the offsite and onsite <br /> drainage of CR-510 east of the 58'" Avenue intersection to the high point at approximately Station <br /> 314+00, and is located adjacent to the CR-510 low point, at Station 308+00. <br /> • Pond 5, located adjacent to the SR-510 low point, at Station 347+70, and on the Kennedy property <br /> just west of 87'" Avenue, is for the additional volume necessary for onsite drainage of SR-510, east <br /> of US- 1 , and that which is not accommodated by the Bristol Bay development. <br /> • Pond 6, represents the location of the Bristol Bay development site, which will accommodate the <br /> SR-510 drainage, in that area. <br /> • Pond 7, is the existing pond on the CVS property, located at the intersection of CR-510 and US- I , <br /> is anticipated to be impacted due to the widening. <br /> "SECTION III — SCOPE OF SERVICES" is being modified to incorporate the following: <br /> The ENGINEER agrees to perform professional design and related services in connection with the project, <br /> as required and set forth in the following: <br /> B. 3. Pond/Prooerty Site Surveys <br /> It is assumed, following pre-60% plan completion, that the project drainage will require seven (7) pond <br /> sites. Of these locations, as stipulated above in Section I — Project Limits and Description, two (2) sites will <br /> take advantage of existing pond sites on the Red Stick Golf Club property and the Bristol Bay development. <br /> However, minor survey detail will be required from the roadway drainage system to the existing pond site <br /> on the Red Stick property . <br /> The ENGINEER shall perform property boundary and topography surveys to acquire sufficient information <br /> to facilitate the design of the project drainage system. Information to be acquired will be imported into the <br /> project Digital Terrain Model and planimetric files. Existing available information will be researched to <br /> expedite the field surveys. <br /> When the fee utilized equals 75%, the ENGINEER will assess and advise the COUNTY if the balance of <br /> the work can be accomplished with the balance of the fee. If the work cannot be completed, the <br /> ENGINEER will notify the COUNTY, in writing, and make a request for a supplemental agreement. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.