Laserfiche WebLink
K. Utility Design <br /> The ENGINEER will prepare utility designs and plans, separate and apart from the roadway plans, <br /> for the 16-inch and 12-inch diameter reuse water lines. The design and plans will include the stub- <br /> outs (for potable water and sanitary sewer force main), summary of pay items, tabulation of <br /> quantities, general notes, any special details, and an opinion of probable construction cost. The <br /> ENGINEER will also locate subsurface utilities, only for those utilities, owned and operated by <br /> Indian River County, at conflict points with the proposed storm sewer facilities. The design and <br /> plans will be prepared in accordance with applicable Indian River County Water Department <br /> standard requirements and regulations of the governing agencies, and as follows: <br /> 1 . Utilitv Services — 16-inch Reclaimed Water Main Design <br /> The work is the preparation of additional construction documents to show the horizontal and <br /> vertical location of a 16-inch reclaimed water main from Station 281 +26.74 to Station <br /> 305+24.60 (approximately 2,398 LF), as referenced from the baseline of construction for CR- <br /> 510. Additional design services will include the following tasks: <br /> a. Perform the horizontal and vertical location design of the proposed 16-inch reclaimed <br /> water main from Station 281 +26.74 to Station 305+24.60. The ends of the reclaimed <br /> water main will be valved and plugged for connection by others in the future. The main <br /> will be located on the north side of the roadway and north of the existing force main. <br /> Any canal or water body crossings will be designed using the directional bore method. <br /> Designing attachments to hang the proposed or existing utilities to the bridges is not <br /> included in this amendment. The design of the reclaimed water main will also include fl- <br /> inch stub-outs for future connections placed at approximately 1 ,000 foot intervals, on <br /> both the north and south side of the roadway. <br /> b. The ENGINEER shall identify potential utility conflicts resulting from the proposed <br /> reclaimed water main conflicting with the proposed potable water main stub-outs and <br /> proposed sanitary sewer force main stub-outs. The existing utilities at these conflict <br /> points will be located vertically and horizontally, as discussed in the Utility Subsurface <br /> Locates item #4 below. This information will be used for design purposes to provide the <br /> minimum vertical clearances as required by the Department of Environmental Protection. <br /> c. The ENGINEER shall prepare Utility Improvement Plan and Profile Sheets at a 1 `40 ' <br /> scale and technical specifications to show location of the reclaimed water main, and <br /> submit to the COUNTY at the 90% and Final Design stages. Note: The Utility <br /> Improvement Plans will also be used to show all other existing utility adjustments and <br /> proposed utility additions. <br /> d. The ENGINEER will coordinate with utility owners to minimize relocations. <br /> 3 <br />