INDIAN RIVER COUNTY MITIGATION REEF PROJECT <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS <br /> 21 . 1 Material Quantity Certification <br /> The CONTRACTOR shall be responsible for obtaining and submitting certified weight <br /> tickets for all truck-hauled material to be used in the construction of the mitigative reefs . <br /> Certified weight tickets shall be clear and legible and shall include empty and loaded <br /> truck weights . Certification shall be made by a certified , independent weighing station <br /> with weight measurements occurring not more than 100 miles apart. The <br /> CONTRACTOR shall be responsible for collecting all weight tickets and shall submit <br /> copies of the tickets , with the daily reports to the COUNTY. Separate copies of all weight <br /> tickets associated with each payment requests shall be submitted by the <br /> CONTRACTOR prior to payment by the COUNTY. Material deemed unacceptable by <br /> the COUNTY for project construction shall not be included in any payment request. <br /> 21 . 2 Completed Reef Certification <br /> As depicted in the plans , there are 36 HRHC and 2 LRLC reefs to be constructed . <br /> Certification of completion for each reef must be made by the COUNTY prior to payment <br /> request for completed work by the CONTRACTOR . Certification shall be in the form of a <br /> diver inspection approved by the COUNTY to meet project specifications . A summary of <br /> each certified complete reef section must be provided with each related payment <br /> request . Reef sections shall be referenced by CONTRACTOR as (e . g . ) HRHC1 , for the <br /> northern most High Relief High Complexity reef unit, with a numerical progression from <br /> north to south to " reference" each of the thirty-six (36 ) HRHC and two (2 ) LRLC units in <br /> subsequent pay requests . <br /> 21 .3 Material Unit Price <br /> The CONTRACTOR shall provide a unit price bid that is competitive with other unit cost <br /> projects similar in nature . Placed Material costs will be estimated on a cost per unit basis <br /> with Placed Material quantities not exceeding 50 , 000 tons total for the entire project <br /> area , including approved completion of all 36 HRHC and 2 LRLC units as specified in <br /> the Plans and these Technical and Environmental Specifications . Approved sections , <br /> following the requirements set forth in the Plans and these Technical and Environmental <br /> Specifications , shall be eligible for payment by the COUNTY. No payment shall be made <br /> for material placed in excess of 50 , 000 tons . <br /> 22 . PAYMENT FOR MOBILIZATION / DEMOBILIZATION <br /> 22 . 1 Description . The work specified in this Section for mobilization consists of the <br /> operations and preparatory work for mobilizing prior to beginning initial work on the <br /> project including , but not limited to , those operations necessary for the movement of <br /> personnel , equipment , supplies , preparation of material and equipment , and movement <br /> of incidentals to the project site , and for the establishment of traffic control , safety <br /> equipment and first aid supplies , sanitary and other facilities , as required by the Plans <br /> and Environmental and Technical Specifications , the Special Provisions , the General <br /> Conditions and State and local laws and regulations . <br /> TS- 18 <br />