labor, materials or equipment in connection with the Work; <br />g. OWNER has been required to pay ENGINEER or ENGINEER's <br />Consultant additional compensation because of CONTRACTOR delays or <br />rejection of defective Work; or <br />OWNER has been required to pay <br />an independent testing <br />laboratory for <br />subsequent <br />inspections, tests, or <br />approvals taken after <br />initial failing <br />inspections, <br />tests, or approvals. <br />SC -14.02.C.1 Delete paragraph GC -14.02.C.1 in its entirety and insert the following <br />paragraph in its place: <br />C. Payment Becomes Due <br />1 Payment shall be made by OWNER to CONTRACTOR according to the Local <br />Government Prompt Payment Act. <br />SC -14.04 Substantial Completion <br />SC -14.04A Delete the 5th, 6th, 7th, and 8th sentences, and insert the following <br />paragraph in its place: <br />In accordance with the provisions of Florida Statutes section 208.735(7)(a)(2005), upon <br />receipt of the tentative certificate of substantial completion from ArchitectlEngineer, the <br />Owner, the ArchitecUEngineer, and the Contractor shall conduct a walk-through inspection <br />of the Project to document a list of any items required to render the Work on the Project <br />complete, satisfactory, and acceptable under this Agreement (herein the "Statutory List'). <br />The Statutory List shall be reduced to writing and circulated among the Owner, the <br />Architect/Engineer, and the Contractor by the Owner or the Architect/Engineer within 30 <br />calendar days after substantial completion. The Owner and Contractor acknowledge and <br />agree that: 1) the failure to include any corrective work, or pending items that are not yet <br />completed, on the Statutory List does not alter the responsibility of the Contractor to <br />complete all of the Work under this Agreement; 2) upon completion of all items on the <br />Statutory List, the Contractor may submit a pay request for all remaining retainage except <br />as otherwise set forth in this Agreement, and 3) any and all items that require correction <br />under this Agreement and that are identified after the preparation of the Statutory List <br />remain the obligation of the Contractor to complete to the Owner's satisfaction under this <br />Agreement. After receipt of the Statutory List by the Contractor, the Contractor <br />acknowledges and agrees that it will diligently proceed to complete all items on the <br />Statutory List and schedule a final walk-through in anticipation of final completion on the <br />Project. <br />14.07 Final Payment <br />SC -14.07.C.1 <br />Delete <br />paragraph <br />GC -14.07.C.1 in its entirety and <br />insert the following <br />paragraph in <br />its <br />place: <br />C. Payment Becomes Due <br />1 Payment shall be made by OWNER to CONTRACTOR according to the Local <br />Government Prompt Payment Act. <br />00800 Supplementary Conditions.doc <br />00800-7 <br />J 107-029121nch WM - Vero Lake EstatesOwumentsV eWo sO dding Contracl Specificationsl00800 Supplementary Condilions.doc <br />