My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-088
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 10:55:23 AM
Creation date
9/30/2015 7:29:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/13/2004
Control Number
2004-088
Agenda Item Number
11.J.4
Entity Name
Brown and Caldwell
Subject
Utilities Department Operations Center Complex Work Order No. 1
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
3738
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 2 — SITE INVESTIGATIONS <br /> 1 . Wetland Delineation/T&E Species Survey — Locate and flag regulatory wetlands, inspect for <br /> and address any threatened and/or endangered species issues/habitat . Delineate wetlands on <br /> a county aerial and include in environmental report. <br /> 2 . Geotechnical Exploration — Provide stake out of proposed boring locations . Perform ( 7) 20- <br /> foot SPT borings under the building areas, ( 16) 6400t auger borings under proposed <br /> pavements, ( 5 ) 10400t auger borings and associated sieve analyses in the stormwater <br /> management areas . Provide the field data and a technical evaluation of the anticipated <br /> groundwater table, soil characteristics and reuse suitability, and bearing pressures for <br /> building footers. <br /> 3 . Topographic and Tree Survey — Using the boundary survey provided, survey the south 700 <br /> feet of the project parcel, including the rights-of--way and intersections adjacent to and 300 <br /> feet beyond the project site . Provide a 100 foot grid for site elevations in the undeveloped <br /> area along with any significant breaks in grade or topography between the grid . Provide 4 <br /> typical cross sections within the grove to establish the ridge and furrow configuration . <br /> Locate existing site improvements and natural features of a dissimilar nature from the <br /> surrounding features. Locate and identify any on-site "protected" trees in the undeveloped <br /> area with a diameter at breast height (dbh) of 4 inches or greater. <br /> 4 . Topographic Survey Drawing — Prepare a certified survey of the site, meeting Florida <br /> Minimum Technical Standards and as required to meet Chapter 914 of the Indian River <br /> County Land Development Code . <br /> TASK 3 — PRELIMINARY DESIGN PHASE <br /> 1 . Preliminary Meetings — Prepare for and attend up to four meetings with Utilities Department <br /> staff to identify site requirements . <br /> 2 . Preliminary Site Plan and Calculations - Develop preliminary site plan conforming to local <br /> land development requirements showing site dimensions, right-of-ways, proposed site <br /> improvements and stormwater tracts . Provide dimensional data and develop site data <br /> calculations . Complete and submit application for preliminary site plan approval . <br /> 3 . Preliminary Stormwater Management Plan - Meet with IRC Engineering staff to coordinate <br /> proposed 41 st Street drainage . Develop a master stormwater plan showing preliminary <br /> location of conveyance system, stormwater treatment and outfall structures . Set preliminary <br /> grades for building finished floors and paving and drainage improvements . <br /> 4 . Landscaping — Research the landscape design standards and requirements necessary for <br /> development of site plans and construction documents in subsequent tasks . Prepare <br /> conceptual landscape and irrigation system design drawing(s) to be used as input to the site <br /> plan approval process . <br />
The URL can be used to link to this page
Your browser does not support the video tag.