Laserfiche WebLink
5 . Architecture — Work with Utilities Department staff to develop the programming (basis of <br /> design) for the three buildings to be constructed on the proposed site . Compile all <br /> information necessary for development of site plans and construction documents in <br /> subsequent tasks . <br /> 6 . Technical Review Committee Meeting - Attend Technical Review Committee ( TRC ) <br /> meeting of the preliminary site plan . Meet with Utilities Department staff to review, discuss <br /> and determine appropriate response to TRC comments . <br /> TASK 4 — SITE PLAN APPROVAL <br /> 1 . Site Plan Application and Submittals - Revise preliminary site plan per comments of <br /> preliminary TRC review. Conduct final site design and prepare plan conforming to local <br /> land development requirements showing all proposed site improvements . Show final <br /> dimensional and site data calculations . Prepare all accompanying exhibits and submittals <br /> required for site plan review. Complete and submit applications for site plan approval . <br /> 2 . Traffic Impact Analysis - Meet with IRC Traffic Engineering staff to determine study <br /> requirements . Perform traffic analysis to determine new trips, turning movements, and <br /> impacted traffic links . Assign trip counts to traffic links for concurrency analysis . Determine <br /> if additional off- site roadway improvements will be necessary. <br /> 3 . Stormwater Management Design and Report - Prepare stormwater management report to <br /> include : flood routings ; lake sizing ; discharge calculations; and recovery analysis . Prepare <br /> plans showing stormwater drainage control devices, structures and treatment measures. <br /> 4 . Water and Wastewater Service - Develop plan and prepare design report for service to the <br /> buildings for potable water and wastewater disposal . <br /> 5 . Landscaping — Refine the conceptual landscape design created initially in Task 3 . Prepare <br /> an illustrative color rendering of the proposed design concept for use in the site plan <br /> approval process . Coordinate landscaping requirements with site plan development to <br /> provide appropriate grading for buffers ; pads ; tree wells ; and accessories for site <br /> adornments . <br /> 6 . Architecture — Prepare preliminary floor plans and building elevations for use in the site <br /> plan approval process . Coordinate architectural requirements with site plan development to <br /> assure consistency and compatibility between site work and building improvements . <br /> 7 . Site Plan Review Meeting — prepare for and attend one meeting with County staff at <br /> approximately the 90 percent completion stage of site plan development . <br />