2007-258
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-258
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2016 12:25:28 PM
Creation date
9/30/2015 11:01:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
07/24/2007
Control Number
2007-258
Agenda Item Number
7.H.
Entity Name
Peter R. Brown Construction
Subject
IRC Jail Expansion - time extension
Change Order 13
Area
4055 41st. Ave. IRC Jail
Project Number
2089
Supplemental fields
SmeadsoftID
6483
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRCJ INFIRMARY TIME EXTENSION ANALYSIS <br /> Project: Indian River County Jail Expansion <br /> Contractor: Peter R. Brown Construction Company, Inc <br /> Architect: Clemons Rutherford & Associates, Inc <br /> Original Substantial Completion 6/2512007 <br /> New Substantial Completion 9/10/2007 <br /> SUMMARY : <br /> TOTAL DAYS IMPACTED: 77 Original Substantial Completion date for Infirmary Building was June 25, 2007 <br /> now Substantial Completion Scheduled for September 10, 2007 Due to <br /> weather conditions, which were believed could be overcome, and unforeseen <br /> existing conditions and utilities, in which additional work was required, the <br /> project experienced unfortunate and unavoidable delays . <br /> December- 06 <br /> DAYS IMPACTED: 1 <br /> WEATHER: 0 <br /> 0 <br /> UNFORESEEN CONDITIONS: 1 Existing sanitary manhole covered by soil and not located indicated Had to <br /> hand dig to locate . <br /> January- 07 <br /> DAYS IMPACTED: 12 <br /> WEATHER: 2 Days of rain greater than 1/4 inch Delayed Demolition, Building Pad and <br /> Footings <br /> 0 Days of recovery due to heavy amounts of rain <br /> UNFORESEEN CONDITIONS: 4 Existing sanitary lines within building slab area required survey to determine <br /> pipe slope and direction routed under existing building to determine final routing . <br /> 6 Planned routing of sanitary lines outside of building slab conflicted with existing <br /> sign, sidewalk and trees Required aftemate routing be engineered and <br /> submitted . Modified route required adjustments to manhole. Continued into <br /> February. <br /> Page 6 of 8 <br />